Investor Presentaiton
Project Development
BUKITASAM
TRANSPACIFIC
RAILWAYE
Project
Upgraded Existing
Railway Line
KERETA API
BATR - Newly
Developed Railway
(Bukit Asam
Bukit Asam
Production Infrastructure & CBM Projects
Status
•
.
•
•
.
•
Transpacific Railway)
•
•
Tanjung Enim – Tarahan Port (410km), TE – Kertapati Port (161km)
100% owned by State Railway Company, PT KAI
Capacity of 22.7Mtpa (2015 – 2029)
Currently, it has a total of 3,071 wagons, included 600 new wagons that arrived in April
2014.
Tanjung Enim - New Coal Terminal in Lampung (280km)
PTBA (10%), Rajawali Asia Resources (80%), China Railway EC (10%)
Investment of USD2 Bn, EPC Contract of USD1.3 Bn
18 Nov 2011, Frame Work Agreement funding with China Bank Consortium was signed.
Currently in finalization for mining JV Restructuring
Project will reach its peak capacity of 25 Mtpa by
• Year 1 7.5 Mt
jump
• Year 2
15.0 Mt
•
Year 3
20.0 Mt
• Year 4
25.0 Mt
Tarahan Port Expansion
•
.
•
Located at the southern tip of Sumatera Island
Newly developed infrastructures for RCD3 & RCD4, Jetty #2 & Shiploader, Additional
stockpile of 2x150,000Mt, and Office.
By 4Q14, will be in operation with the new Jetty #2 is able to accomodate the giant
'Capesize' bulkcarrier vessels of upto 210,000DWT.
Will be the largest coal terminal on Sumatera
Coal Bed Methane
(CBM)
•
Located in Tanjung Enim Mine
•
.
•
PTBA (27.5%), Pertamina (27.5%), Dart Energy Australia (45%)
+40 MMSCF (Million Standard Cubic Feet per Day, with potential reserve of 0.8 Trillion
Cubic Feet (TCF)
Investment of USD14.48 Mn (for the first three years)
15View entire presentation