Copperstone Project Pitch
Interval
From
To
Length
Gold*
Thickness**
Hole ID
meter
meter
AZG-21-13-07
2.9
4.7
and
25.9
27.4
meter
1.8
1.5
gram/tonne
meter
43.97
0.8
2.64
0.7
AZG-21-21-22
49.1
62.7
13.6
4.82
6.1
includes
53.6
61.2
7.6
7.62
3.4
also
60.5
61.2
0.7
27.77
0.3
and
80.7
82.4
1.7
4.70
0.8
AZG-21-21-24
65.5
68.6
3.1
18.73
1.2
includes
65.5
67.1
1.6
26.93
0.6
also
89.6
91.4
1.8
21.66
0.7
2021 Underground Drilling Results
True
Effective Mining
Width ***
meter
1.9
1.6
8.0
Future drilling programs, with the
objective of further mine life extension,
will target areas beyond the current
program affected area of 500 meters of
strike length. The ultimate goal would be
the addition of resources along all
sections encompassing the entire current
resource strike length of over 1,550
meters.
14.4
0.7
1.8
2.7
1.4
1.7
and
138.7
139.9
1.2
1.16
0.5
1.2
and
150.5
151.4
0.9
12.53
0.3
0.8
AZG-21-10-17
12.6
17.4
4.8
3.32
3.8
9.0
*
includes
12.6
13.5
0.9
7.13
0.7
1.7
also
16.2
17.4
1.2
5.47
1.0
and
43.3
44.0
0.8
14.80
0.6
2.3
1.4
AZG-21-13-12
12.8
14.3
1.5
22.07
1.4
3.4
and
18.3
19.5
1.2
11.73
1.2
2.8
AZG-21-13A-19
18.8
19.9
1.2
12.67
0.5
and
25.6
27.0
1.4
2.24
0.6
AZG-20S-16
222.5
231.6
9.1
1.98
8.1
1.1
1.4
14.1
includes
224.0
227.1
3.1
3.57
2.7
and
263.7
265.2
1.5
2.69
1.3
4.7
2.3
AZG-20S-23
109.7
125.0
15.2
3.27
13.5
23.5
includes
117.3
123.4
6.1
6.02
5.4
9.4
Grades herein are reported as uncapped values.
** Estimated distance between the foot wall and hanging wall of
the mineralized zone measured perpendicularly to the edges.
*** Effective Mining Width is defined as the distance between the
foot wall and hanging wall of the mineralized zone measured
horizontally and matches the planned mining method. The
mining method used to calculate reserves will extract ore by drift
mining along strike in a defined ore stope. The Effective Mining
Width is the width that miners will be working within.
and
132.6
134.1
1.5
1.24
1.3
2.3
ARIZONA
GOLD CORD
24
24View entire presentation