Copperstone Project Pitch slide image

Copperstone Project Pitch

Interval From To Length Gold* Thickness** Hole ID meter meter AZG-21-13-07 2.9 4.7 and 25.9 27.4 meter 1.8 1.5 gram/tonne meter 43.97 0.8 2.64 0.7 AZG-21-21-22 49.1 62.7 13.6 4.82 6.1 includes 53.6 61.2 7.6 7.62 3.4 also 60.5 61.2 0.7 27.77 0.3 and 80.7 82.4 1.7 4.70 0.8 AZG-21-21-24 65.5 68.6 3.1 18.73 1.2 includes 65.5 67.1 1.6 26.93 0.6 also 89.6 91.4 1.8 21.66 0.7 2021 Underground Drilling Results True Effective Mining Width *** meter 1.9 1.6 8.0 Future drilling programs, with the objective of further mine life extension, will target areas beyond the current program affected area of 500 meters of strike length. The ultimate goal would be the addition of resources along all sections encompassing the entire current resource strike length of over 1,550 meters. 14.4 0.7 1.8 2.7 1.4 1.7 and 138.7 139.9 1.2 1.16 0.5 1.2 and 150.5 151.4 0.9 12.53 0.3 0.8 AZG-21-10-17 12.6 17.4 4.8 3.32 3.8 9.0 * includes 12.6 13.5 0.9 7.13 0.7 1.7 also 16.2 17.4 1.2 5.47 1.0 and 43.3 44.0 0.8 14.80 0.6 2.3 1.4 AZG-21-13-12 12.8 14.3 1.5 22.07 1.4 3.4 and 18.3 19.5 1.2 11.73 1.2 2.8 AZG-21-13A-19 18.8 19.9 1.2 12.67 0.5 and 25.6 27.0 1.4 2.24 0.6 AZG-20S-16 222.5 231.6 9.1 1.98 8.1 1.1 1.4 14.1 includes 224.0 227.1 3.1 3.57 2.7 and 263.7 265.2 1.5 2.69 1.3 4.7 2.3 AZG-20S-23 109.7 125.0 15.2 3.27 13.5 23.5 includes 117.3 123.4 6.1 6.02 5.4 9.4 Grades herein are reported as uncapped values. ** Estimated distance between the foot wall and hanging wall of the mineralized zone measured perpendicularly to the edges. *** Effective Mining Width is defined as the distance between the foot wall and hanging wall of the mineralized zone measured horizontally and matches the planned mining method. The mining method used to calculate reserves will extract ore by drift mining along strike in a defined ore stope. The Effective Mining Width is the width that miners will be working within. and 132.6 134.1 1.5 1.24 1.3 2.3 ARIZONA GOLD CORD 24 24
View entire presentation