Phoenix Feasibility Study 2023
$70.00
$60.00
$50.00
$40.00
All-in / Full Costs - USD$/lb U308
$30.00
$20.00
$10.00
$0.00
ISR
Denison's development portfolio projects:
Positioned amongst the lowest all-in cost assets of UxC's First Tier
Lenison
Sample of Global Production Costs - August 2023 (1)(2)(3)
Planned and Producing Operations (with Mining Method)
UxC's "First Tier"
(includes lowest-cost projects with full costs up to ~US$33/lb U₂Og)
US$25.47
US$24.93 (2023)
(2020)
US$16.04
(2023)
Akbastau
Inkai
ISR
Phoenix/Wheeler
ISR
Kharasan
ISR
Arrow
UG
UG
THT/Waterbury
ISR
Gryphon/Wheeler
UG
Olympic Dam
Denison/Canada
Canada
Kazakhstan
UG
"Third/Fourth Tier"
(up to US$92/lb U308)
"Second Tier"
(up to ~US$48/lb U3O8
McArthur River
Cigar Lake
UG
UG
Dasa
Honeymoon
Australia
ISR
UG
Rabbit Lake
U.S.A.
Rössing
OP
OP
Husab
Goliad
Imouaren
ISR
Africa
OP
NOTES:
(1) Chart data, including
"full costs" and UxC's
categorization of
production cost "tiers",
have been derived from
UxC's estimates of
worldwide production
costs from the Uranium
Production Cost Study
dated August 2023.
(2) For Phoenix and
Gryphon, see the Wheeler
River Technical Report
titled "NI 43-101 Technical
Report on the Wheeler
River Project, Athabasca
Basin, Saskatchewan,
Canada" dated June 23,
2023.
(3) For THT/Waterbury,
refer to the Waterbury
Lake Technical Report
titled "Preliminary
Economic Assessment for
the Tthe Heldeth Túé (THT)
(J Zone) Deposit,
Waterbury Lake Property,
Northern Saskatchewan,
Canada" dated October
30, 2020.
5View entire presentation