Investor Presentaiton slide image

Investor Presentaiton

Development Prohibited or Restricted areas: SI. NO 1. 2. Low tension power lines: Description (a) From the portion of building accessible to persons (b) From the portion of building inaccessible to persons Min. Horizontal clearance-1.50m Min. Vertical clearance -4.50m Min. Horizontal clearance-1.25m Min. Vertical clearance -2.50m High tension power lines: (c) From the portion of building accessible to persons (d) From the portion of building inaccessible to persons Min. Horizontal clearance-1.75m Min. Vertical clearance -4.50m Min.Horizontal clearance-1.25m Min. Vertical clearance -2.50m 3. Cremation and burial Grounds 4. Electric/Gasified crematorium 5. Railway tracks Minimum Requirement r.ramson associates architects & engineers 30m from the cremation or burial grounds Wherever piped water supply system not available For construction around the crematoria site, no clearance is required; however the crematorium structure shall be constructed with a setback of minimum 10m all around within its site 30m from the railway boundary; however with clearance obtained by the applicant from the Railway authority concerned, constructions can be permitted Note: In sites which abut or affected by the alignments of the LT/HT electric over head power lines or such underground cables, constructions can be permitted only with the no objection certificate obtained by the applicant from the TNGEDCO for such constructions. www.ramsonassociates.com 5 Tube-50-850-25
View entire presentation