Lipetsk Special Economic Zone Development slide image

Lipetsk Special Economic Zone Development

L architet SEZ milano Jaano City door MerloniProgetti Prospective view of the service centre in the ZES, first phase of implementation Source: Merloni Progetti spa, Marco D'Azzo Milan, Arassociati Milan, Lipetskgrasdanproject Institute Lipetsk As regards the road system, there is a road connecting both the Districts of Lipetsk, Gryazy and Dobrinka, and the ZES with the urban area of Lipetsk. This regional road stretches 15,8 km: 13,6 km have a width of 7,5 m and 2,2 of these have a width of 7m. The daily capacity is 7,000 automobiles. As regards the railway, its length is 70 km with three railway parks. There area two tain stations in the SEZ: the one in Lipetsk, 20 km far way, and the one in Gryazy 18 km far away. The SEZ is 1,2 km far from the Kazinka station. In 2005 a connection was built between the Kazinka station and the SEZ. The criteria used for planning this big industrial area of 10 square meters, where it is expected that 12,000 people will work are the following: Keeping and improving the meaningful features of the area like the vegetation and water courses that are particularly important here. Building an industrial city that can represent a model of sustainable development. This city must be able to meet the needs of the market in a rational and flexible way by integrating with the natural environment and with the existing infrastructures.
View entire presentation