Investor Presentaiton slide image

Investor Presentaiton

SAFETY PROCESS ABRIDGED ENGINEERING MANAGEMENT PROCESS AND ASSET LIFECYCLE Process integration Client Brief User Requrement Specification Concept Design ( incl. drawings) Preliminary design to refine and prove concept design and confirm scope (ind, drawings) OVERVIEW: INTEGRATED SUBSTATION ENGINEERING AND SAFETY PROGRAMME (COMPLIES WITH HARMONISED WHS LEGISLATION) Generate V&V Matrix Evaluate Concept Options Draft Engineering Project Scope / detailed requirements Scope & Drawings issued, including safety requirements Engineering Design Specification Safety Review of Options Safety Plan Safety Assessment D&M Safety in Design Review (workshop) (focus on through-life ownership) HAZOP Study (for high-risk, non- routine or new 0&M activities) Select safety and design activities relevant to project scale and scope of work Use the Safety Plan to describe how safety. activities will be integrated throughout the project lifecycle CONCEPT DESIGN PHASE Safety in Design Actions List PRELIMINARY DESIGN PHASE SPEC. PHASE Responsibility Key: Client Activities Detail Designer Plant Risk Assessment Data Kick-off and Design Risk Assessment with detail designers System-level design (aka 15% design) Tick-off activities on V&V matinx continues Tick-off verification and validation activities on V&V matrix as they occur Accept Design Verification. RZE Check-List until V&V completed Critical design (aka "40% design) Final detail design (aka 80% design). Design Verification FC design (certified by H the designer) Construction Safety Report Safety in Design Workshop (WHS Reg 295) System Design Critical Design Review Review Final Design Review Implement Safety Actions To include ongoing updates to the Safety Actions List Status of SafetyActions List to be checked at each design review Monitor implementation of Safety Actions Independent third party Constructor O&M DETAIL DESIGN PHASE Design verification and validation (ongoing to hand-over) Construction, commissioning and testing Review and accept Safety Report Monitor Final Safety Actions list implementation during construction and commissioning Final Safety Actions List Safety Process Audit CONSTRUCTION Note: 19 As-buit drawings Hand-Over for O&M Operation and Maintenance END OF ASSET LIFE Q&M Procedures (new/updated) In-Service Design Change (see Note below) Review Saefty Lessons Learned and Effectiveness Review Effectiveness of safety actions after one year DE COMMISSION AND DISPOSAL Innovations captured to feed- back into project processes, templates, design manuals, etc) Review design changes against Safety Report (including final Safety Actions List) POST-CONSTRUCTION O&M D&D In-service design changes could be a CAPEX Project (repeat whole process) or an OPEX Project, in which case the Operation & Maintenance personnel will manage the design changes. These design changes should be checked against the applicable Safety Report and have their own Safety Assessment, Plan & Actions. E ENGINEERING SYSTEMS Engineering Management Systems Engineering M MANAGEMENT Management Systems Copyright Engineering. Systems. Management. Pty Ltd
View entire presentation