Investor Presentaiton slide image

Investor Presentaiton

Technology & innovation will transform the physical footprint of mining. $0.1-0.3bn pa capex to support FutureSmart Mining TM & the delivery of our Sustainable Mining Plan targets Initiative Bulk ore sorting Coarse particle recovery (CPR) Hydraulic Application Copper & Nickel Copper, PGMs & Iron Ore dewatered stacking (HDS) Copper & PGMs Impact Deliver improved feed grade to plants through early rejection of waste, resulting in energy. water and cost savings Innovative flotation process allows material to be ground to a larger particle size, rejecting coarse gangue and allowing water to release from coarser ore particles, improving energy efficiencies and water savings Engineering of geotechnically stable tailings facilities that dry out in weeks, facilitating up to 85% water recovery Zero Emissions Haulage Solution (ZEHS) Portfolio-wide Through FirstMode, developing hydrogen- powered ultra-class mining haul trucks to decarbonise our largest source of diesel consumption, through renewable energy • • • • • Progress Los Bronces (Copper) Confluencia Plant (~65% of complex feed) unit operational with workplans under way to support business as usual. Currently, units are being impacted by feed constraints Barro Alto (Nickel) in-pit upgraded unit commenced operation in Q2 2023 and currently ramping up to achieve upgrade potential. Planning for trials at Kolomela (Iron Ore) under way El Soldado (Copper) CPR unit in operation Constructing full scale system at Mogalakwena North Concentrator (PGMS) - slurry commissioning completed and in the ramp-up and optimisation phase. Expected to deliver productivity benefits in H2 2023 CPR approved at Quellaveco (Copper) to treat flotation tails, improving recoveries by ~3% over the LOA. Commissioning expected in late 2023 Feasibility work continues at Los Bronces (Copper) & Minas-Rio (Iron Ore). Options being investigated at Collahuasi (Copper) El Soldado (Copper) - the trial is still on-going and expected to continue to Q2 2024. Phase 1 is complete, and results are encouraging with -80% water recovery and rapid consolidation Assessing application to tailings expansion at Mogalakwena (PGMS) with benefits from water quality and quantity improvements. Brownfield trial started in Q2 2023, after learnings from El Soldado trial ZEHS hydrogen-powered hybrid mine haul truck at Mogalakwena (PGMS) successfully completed its prototype testing phase, accessing the deepest parts of the mine and hauling 300t loads Truck development continues with second generation powerplant, refuelling systems and infrastructure to be built and tested In January 2023, completed the transaction to combine First Mode and Anglo American's nuGen TM ZEHS, to accelerate the transition of mining and other heavy industries towards zero emissions 1. Technology and innovation capex is estimated to be between $0.1-0.3bn pa (previously $0.2-0.5bn pa), including capex on Zero Emissions Haulage Solution (ZEHS) programmes and the lower guidance reflects equity accounting of the SA Regional Renewable Energy Ecosystem joint venture, Envusa Energy. Anglo American 73
View entire presentation