Thailand Focus 2022
Projects Details | Myanmar, Malaysia, Other SEA
Project Name
1
Block K (Malaysia)
- Kikeh
Status
Phase
Participating Interest* (%)
Sales Vol Gas
(MMSCFD)
Sales Vol Liquid
(KBPD)
- Siakap-North Petai field (SNP)
- Gumusut-Kakap field (GK)
2
Sarawak SK309 and SK311
OP
Production
PTTEP
(Malaysia)
3
Block H (Malaysia)
OP (Kikeh & SNP)
Production
PTTEP
Kikeh
56%
JV (GK)
28
**
SNP
22.4%
25*
**
GK
7.17%
198 **
18*
42 - 59.5%
OP
Production
PTTEP
42 -56%
256 **
4
-
Malaysia Other projects
OP
Exploration
PTTEP
42.5 -80%
(varied by
permits)
5
Yadana
(Myanmar)
JV
Production
734
PTTEP
25.5%
TotalEnergies
31.24%
Chevron
28.26%
MOGE
15%
6
Zawtika M9 & a part of M11
OP
Production
322
PTTEP
80%
(Myanmar)
Myanma Oil and
20%
Gas Enterprise
(MOGE)
7
M3
OP
Exploration
PTTEP
100%
(Myanmar)
8
MD-7
(Myanmar)
OP
Exploration
PTTEP
TotalEnergies
50%
50%
Note: *
**
***
PTTEP denotes respective PTTEP subsidiaries participating in the project
Sales volume represent average volume for 100% of the project during 6M2022 except Malaysia (Production volume 100%)/ For Block K, gross production is net off unitization
Status: OPPTTEP operatorship / JOC = PTTEP joint operatorship/ JV = PTTEP Joint Venture Partner
37
.
Latest Status
PTTEP
The inspection and maintenance were completed as planned and the
Project continued drilling well in GK as part of field development phase 3
2 new infill wells have completed drilling, with expected production in
Jul'22
Capable of producing up to 270 MMSCFD.
SK410B: Plan to drill 1 wildcat well in Jul'22 and expected FID in 2023 for LLB
SK417 Planning and preparing for the drilling of appraisal well (NANGKA-2)
in 2022 exploration campaign
SK405B, SK438, SK314A: Well planning in progress
SB412 Preparing for exploration activities and focusing on seismic activity
Became a new operator on 20 July 2022
Activities for transition performed in a safe and orderly manner for smooth
and continuity of operation
Maintain operations. Some activities are delayed due to COVID-19 and
political situation.
Waiting for approval of PSC Supplementary
Closely monitor the situations to assess risks, as well as to prepare for an
appropriate action plan
Termination process in progressView entire presentation