Murphy West Uranium Project Overview
Nabarlek Project: Nabarlek North and South Prospects
Exploring the Nabarlek Fault
Recent drilling has identified:
Shallow eU3O8 intercepts at the unconformity at Nabarlek
North incl:
11.2m @ 0.33% eU3Og from 41m
Incl 5.2m @ 0.51% eU308
4.6m @ 0.32% eU3O₂ from 47m (RC122)
Incl 0.7m @ 0.83% eU3O
Significant unconformity uranium mineralisation south of
mineralised dolerite incl:
2.0m @ 0.77% U3O8 and 0.6g/t Au from 132m (RC37)
Fracture hosted uranium in dolerite (Nabarlek South) from
2022 drilling:
10.1m @ 1.10% U3O8 from 124m
54.6m @ 0.20% U3Og from 77m
Follow-up drilling to test both Nabarlek North and
Nabarlek South planned over the coming month
Nabarlek North
316 000mE
RC122
4.6m @ 0.32% eU,O, from 47.1m
incl. 0.7m @ 0.83% eU₂O,
RC174
11.2m @ 0.33% eU₂O, from 41m
incl. 5.2m @ 0.51% eU₂O
RC173
21.5m @ 0.11% eU3O₂ from 35.8m
incl. 1.3m @ 0.61% eU₂O
00
Mining Lease
Oenpelli Dolerite
N
1Km
D
о
Nabarlek Mine
Nabarlek Fault
24 Mlbs @ 1.84% U30%
(PRODUCED)
Excised
10.1m @ 1.10% U₂O
from 124m
54.6m @ 0.20% U₂O
from 77m
00
°
°
00
North Fault
100000
Nabarlek South
°
320 000mE
2023 RC Drillhole
RC & DD Holes Max U₂O, ppm
>1000
500 1000
100 500
Oenpelli Dolerite
Fault/Structure
.
<100
8 640 000mN
RC37
2m @ 0.77% U3O8
+ 0.6g/t Au
from 132m
Mining Lease
Exploration Lease
RC 13
5m @ 0.16% U₂O
Coopers
from 46m
Open To East
Nabarlek Fault
00
: &
Coopers South
637 000mN
8 637
9View entire presentation