Laos Sustainability Report slide image

Laos Sustainability Report

14 Innovating engineering technology Strategy of "integrated industry chain" The Nam Ou River cascade hydropower stations project is developed by Overseas Investment Co., Ltd. under PowerChina, and other key companies undertake the design, construction, supervision, manufacturing and operation of the project. In this project, all participating companies fully leverage their advantages in technology, management and construction, and generate an innovative model of "integrated industry chain" with the characteristics of Nam Ou River. The core of the model is the "Quadriad integration" of investment & development, design & supervision, construction, and operation & maintenance, which aims to connect the entire industry chain from investment, financing, construction management to asset operation, and realize the control of the project's full life cycle as well as the entire industry chain. The unique advantages of the "integrated industry chain" model of the Nam Ou River project make the construction and development process controllable and help the overall improvement of operational performance. Thanks to the model, the Nam Ou River project has achieved a solid progress in localized operations, ecological and environmental protection, project resettlement, and charity and public welfare, realizing significant social benefits. Meanwhile, the model has expanded the international market development channel. All participating parties of the project turn their respective advantages into integrated advantages, improving value creation, innovation and international competitiveness. In the "2016 Energy Annual Conference and the 2nd Energy Development and Innovation Forum" organized by China Reform Daily, PowerChina's overseas investment "integrated industry chain" management model won the "2016 Overseas Energy Project Innovation Award". Integrated Industry Chain NAM Ou 7 HPP NAM Ou 4 HF ONOUS 中国电建 POWERCHINA In November 2017, river closure was simultaneously completed for Nam Ou River level-1 and level-7 Hydropower Stations. Deputy Prime Minister of Laos Zonse Siphandone attended the river closure ceremony and struck the brass gong for blessings. 15 "In 2016, determined to overcome whatever difficulty it may encounter, PowerChina started the Nam Ou River cascade hydropower development project in Laos. The Nam Ou River project involves unprecedented large scale, huge construction span, severe technological difficulties, tough resettlement project and complicated external environment. However, with the innovative strategy of "integrated industry chain", PowerChina fully leverages the professional capabilities of the investment subject in project financing, capital operation and construction management, and demonstrates the strengths of the leading enterprise of China's hydropower industry that is undoubtedly the No.1 brand in the international hydropower construction!" -Organization Committee of 2016 Energy Annual Conference and the 2nd Energy Development and Innovation Forum The "seven-level reservoir" highlights the benefits of the whole basin, plays the connection and adjustment role of the basin cascade hydropower stations, and generates significant comprehensive economic and social benefits of the cascade hydropower stations. With minimum people relocation, minimum flooding loss of arable land and woodland, and minimum environmental impact, the development solution obtains maximum comprehensive benefits and achieves sustainable development. The completed hydropower stations have played a positive role in adjusting seasonal drought and flood within the basin, improving the flood control capacity of the lower reaches, improving river shipping, reducing water loss and soil erosion, and protecting ecological balance, and have gained recognition from the Laotian government and international environmental organizations. The brass gong for blessings O Design plan of a "seven-level reservoir" The Nam Ou River project innovatively adopts the design plan of a "seven- level reservoir". The plan involves small amount of earthwork and can minimize environmental impact caused by the project's construction. Furthermore, the operation and adjustment mode of "seven-level connectivity" can maintain the ecological system balance of the river basin to the largest extent. The Nam Ou River "seven-level reservoir" is developed in two phases, with a total installed capacity of 1.272 million kilowatts. After completion, it will be an important clean energy base for Northern Laos, providing reliable power supply for the construction of the China-Laos Railway and Laos' "Southeast Asia Battery". The first phase of the Nam Ou River hydropower stations has been put into operation; total installed capacity of the second phase hydropower stations is 732,000 kilowatts, and the construction of the main project started in April 2016, which is expected to start power generation in 2019. A total installed capacity of 1.272 million kilowatts Expected to start power generation in 2019 O Computer network management After completing the construction of the first hydropower investment BOT project in Laos, Nam Ngum 5 Hydropower Station, No. 10 Bureau of SINOHYDRO under PowerChina has taken up the responsibility of the hydropower station's operation and maintenance. From construction management to operation and maintenance management, lackage of talent has become the biggest issue. However, PowerChina employees are bold in practice and innovation. Informatization management has been introduced, realizing computer network management covering decision makers and production operations of various departments and workshops (teams and groups) of the grassroots hydropower station, and creating good internal and external environment for the hydropower station's safe and economic operation. Since the hydropower station was put into operation, equipment has been in a sound condition, and operation and maintenance has been in order. There has been stable and safe operation for over 1,200 days, and electricity generated accumulatively is more than 200 million kilowatt-hours, bringing tangible benefits for the Laotian government and people. There has been stable and safe operation for over 1,200 days Electricity generated accumulatively is more than 200 million kilowatt-hours Power Construction Corporation of China Laos Sustainability Report
View entire presentation