Investor Presentaiton
NHPC - Projects in Operation….. contd.
एनएचपीसी
NHPC
S.No.
NHPC Project
Installed
Capacity
Design
Energy
Year of
Comm.
Capital Cost
as on 31.03.20
Tariff (18-19)
(Rs. /kwh)*
(MW)
(MU)
11
Teesta-V, (3x170)
510
2572.70
2008
2796.72
Type of the project
2.33 ROR with small pondage
Sikkim
(Mar)
12
Sewa-11, (3x40)
120
533.53
2010
1152.71
5.47 ROR with small pondage
Jammu & Kashmir
(Jun)
13
Chamera-III, (3x77)
231
1108.17
2012
2129.07
3.94 ROR with small pondage
Himachal Pradesh
(Jun)
14
Chutak, (4x11)
44
212.93
2013
937.39
Jammu & Kashmir
(Jan)
8.50 RO
15
TLDP-III, (4x33)
132
594.07
2013
1931.49
5.90 ROR with small pondage
West Bengal
(Mar)
16
Nimoo Bazgo, (3x15)
45
239.33
2013
1071.98
9.88 ROR with small pondage
Jammu & Kashmir
(Jan)
17
Uri-II, (4x60)
240
1123.77
2014
2331.40
Jammu & Kashmir
(Feb)
18
Parbati-Ill (4x130)
520
1963.29
2014
2722.05
Himachal Pradesh
(May)
TLDP IV (4×40), West
2016
1822.95
19
160
720.00
2.89
Bengal
(Aug)
5.13 ROR
3.08 ROR with small pondage
3.08 ROR with sn
Run of River with small
poundage
Kishanganga (3x110)
2018
20
330
1712.96
5812.70
4.08
Run of River with Pondage
Jammu & Kashmir
(Mar)
Total-A
5451
24674.14
39649.95
3.35