Investor Presentaiton slide image

Investor Presentaiton

NHPC - Projects in Operation….. contd. एनएचपीसी NHPC S.No. NHPC Project Installed Capacity Design Energy Year of Comm. Capital Cost as on 31.03.20 Tariff (18-19) (Rs. /kwh)* (MW) (MU) 11 Teesta-V, (3x170) 510 2572.70 2008 2796.72 Type of the project 2.33 ROR with small pondage Sikkim (Mar) 12 Sewa-11, (3x40) 120 533.53 2010 1152.71 5.47 ROR with small pondage Jammu & Kashmir (Jun) 13 Chamera-III, (3x77) 231 1108.17 2012 2129.07 3.94 ROR with small pondage Himachal Pradesh (Jun) 14 Chutak, (4x11) 44 212.93 2013 937.39 Jammu & Kashmir (Jan) 8.50 RO 15 TLDP-III, (4x33) 132 594.07 2013 1931.49 5.90 ROR with small pondage West Bengal (Mar) 16 Nimoo Bazgo, (3x15) 45 239.33 2013 1071.98 9.88 ROR with small pondage Jammu & Kashmir (Jan) 17 Uri-II, (4x60) 240 1123.77 2014 2331.40 Jammu & Kashmir (Feb) 18 Parbati-Ill (4x130) 520 1963.29 2014 2722.05 Himachal Pradesh (May) TLDP IV (4×40), West 2016 1822.95 19 160 720.00 2.89 Bengal (Aug) 5.13 ROR 3.08 ROR with small pondage 3.08 ROR with sn Run of River with small poundage Kishanganga (3x110) 2018 20 330 1712.96 5812.70 4.08 Run of River with Pondage Jammu & Kashmir (Mar) Total-A 5451 24674.14 39649.95 3.35 * Tariff for 2019-20 yet to be notified.
View entire presentation