Private Power and Infrastructure Board
ANNUAL REPORT
Kathai-II Small Hydropower Project
Ashkot Hydropower Project
Private Power and Infrastructure Board
Kathai-II Hydropower Project is to be located on Upstream of existing Kathai-I Hydropower Station on
Kathai Nullah, District Hattain, Azad Jammu & Kashmir. Kathai-II Hydro (Pvt) Limited is a SPV under
project venture of M/s JDW Sugar Mills Ltd, to set up Run-Off-The-River 8.0 MW Hydropower Plant
(HPP) in District Hattian, AJ&K. This project shall also be implemented on Build, Own, Operate and
Transfer (BOOT) basis under Power Generation Policy 2015 with a concession period of thirty years after
construction period comprising of three years.
Salient features of project are as follows:
>> Location:
Key milestones achieved
Upstream of existing Kathai-I
>
Issuance of LOI by GOAJ&K
Hydropower Station on Kathai
>
Approval of Feasibility Study:
Nullah, District Hattain,
>
EPC Stage tariff Determined by NEPRA:
06.06.2012
09.11.2016
22.11.2018
Azad Jammu & Kashmir Ghori
>
Wala Katha, Muzaffarabad, Azad
Jammu & Kashmir
>
Approval of PPIB Board for issuance of LOS: 06.05.2019
Issuance of LOS (Tripartite LOS) by PPIB:
20.11.2019
>
Capacity:
8.0 MW
>
Applicable Policy
2015
The Ashkot Hydropower Project is identified as a raw site on the Neelum River near the village of
Ashkot, some 75 Km from Muzaffarabad capital of AJ&K. The Project is owned by a SPV Ashkot Energy
(Pvt) Limited and is being developed by the Laraib Group, the developer of the first hydro IPP of
Pakistan i.e. 84 MW New Bong Escape Hydropower Project and the 700 MW Azad Pattan Hydro IPP.
Considering its capacity as 40 MW, the earlier development of the Project was initiated by the GOAJ&K.
Later on, during the conduct of feasibility study, the capacity of the Project was optimized to 300 MW.
It is worth mentioning that under the legal regime in AJ&K, the projects above 50 MW have been
processed by PPIB in the capacity of Agent of the AJ&K Council. Therefore, the GOAJ&K requested for
transfer of the Project to PPIB in the backdrop of optimized capacity. The Board of PPIB allowed PPIB
to process the Project under the Policy for Power Generation Projects 2002. The Board further allowed
PPIB to evaluate the technical and financial credentials of the Project Company/Sponsors for its
consideration prior to issuance of Letter of Interest. Accordingly, the process for evaluating technical
and financial credentials of sponsors through independent consultant has been initiated.
The Ashkot Hydropower Project is on hold due to delay in approval of IGECP by NEPRA. Once project is
included in IGCEP and thereafter, it is approved by the NPERA, the PPIB would be able to further
process this projects. The Project entails Foreign Direct Investment of more than US$ 800 Million with
the capacity of generating energy upto approximately 1347 Gwh per annum.
Current Status:
Sponsors are in the process of achieving the Financial Close and execution of project agreements etc.,
under the LOS.