Investor Presentaiton slide image

Investor Presentaiton

Woodsmith: a clear strategic fit Quality asset Competitive product Progressing project infrastructure 27 year life1 Based on Ore Reserves ~10Mtpa POLY4 produced post ramp up ~$1.1bn invested to date Key permits in place $40-50/t unit cost >50% margin potential Low carbon, organic² 85% less carbon emissions³ ~$0.6bn 2022 capex Optimisation of development timeline and design ongoing5 1. Please refer to the most recent Anglo American plc Ore Reserves and Mineral Resources Report for more details. 2. Organically certified. Currently certified for organic use in EU and North America with other certification pending for approval. 3. Up to 85% lower carbon emissions than the equivalent conventional nutrient products, with little to no waste generated in its production and minimal processing required. 4. This represents capex invested to date by Anglo American: $0.3bn capex in 2020, $0.5bn capex in 2021 and H1 2022 $0.2m - difference due to rounding. 2022 capex guidance of -$0.6bn is approved. 5. Final design engineering under way; capex & schedule then subject to Board approval. Anglo American 72
View entire presentation