Investor Presentaiton slide image

Investor Presentaiton

65 59 ANNUAL REPORT P Private Power and Infrastructure Board ANNUAL REPORT Turtonas-Uzghor Hydropower Project Riali-II Small Hydropower Project Private Power and Infrastructure Board The proposed 82.25 MW Turtonas-Uzghor hydropower project is a Raw Site run of river scheme identified to be located on River Golen Gol which is a left bank tributary of Mastuj River. It joins with Mastuj River about 22 km north-east of Chitral Town, KP. The identified weir site on Golen Gol is approx. 11 km upstream of Golen Gol. The power house site is proposed on right bank of Golan Gol River near Uzghor Village. Salient features of project are as follows: Riali Hydropower is proposed on the Ghoriwala Katha Stream, a right bank tributary of Neelum River with its confluence with Neelum River about 15 kms upstream of Muzaffarabad near Ghori Bazar. The project is proposed in the lower reach of Ghoriwala Katha with intake near village Bagh and Powerhouse near village Ghori 400 meters upstream of the confluence of Ghoriwala Katha with Neelum River. Riali Hydro Power Company (Private) Limited (RHPCO) is a project venture of the Sachal Group. The company is a special purpose vehicle (SPV) to set up a Run-Off-The-River 7.08 MW Hydropower Plant (HPP) near Muzaffarabad (the Project). The Project shall be implemented on BOOT (Build, Own, Operate and Transfer) basis under Power Generation Policy 2015 with a concession period of thirty years after construction period of three years. Key milestones achieved > Sponsors: Sinohydro-Sachal Consortium > Issuance of LOI: > Location: > Capacity: > Applicable Policy Golen Gol River, Chitral Valley KP 82.25 MW 2015 > > > Approval of Feasibility Study: Re-submission of petition for Feasibility Stage Tariff to NEPRA: Submission of request to NEPRA 20.03.2017 03.06.2019 03.02.2020 > For issuance of Generation License: 18.02.2020 Salient features of project are as follows: Sponsors: Key milestones achieved Current Status: After completion of Feasibility Study and its approval accorded by PPIB/POE, Sponsor has applied to NEPRA for Feasibility Study stage tariff and grant of Generation Licence for the Project on 3rd February 2020 and 18th February 2020 respectively. Delay in approval of IGCEP is also adversely affecting the project. Sachal Engineering Works (Pvt.) Ltd, Pakistan > Issuance of LOI: > Approval of Feasibility Study: 26.04.2004 09.11.2016 > Location: > Capacity: > Applicable Policy Ghori Wala Katha, Muzaffarabad, Azad Jammu & Kashmir 7.08 MW 2015 > A A > EPC Stage tariff Determined by NEPRA: 20.11.2018 Approval of PPIB Board for issuance of LOS: 06.05.2019 > Issuance of LOS (Tripartite LOS) by PPIB: 16.10.2019 Current Status: After CPPA-G consent issued on 26th May 2017 for purchase of power, Transmission line study has been completed and submitted to PESCO for approval/endorsement. Sponsors have already started construction at project site. Sponsors are in the process of achieving Financial Close and execution of project agreements etc., under the LOS. For timely completion of project, the sponsors have already started construction work prior to achievement of Financial Close with their equity share. 99 66
View entire presentation