PRODUCTION OUTLOOK - SUPPLEMENTARY GUIDANCE
Copper²
Units
2019
2020F
2021F
2022F
kt
638
640-650
Previously: 630-660
640-680
Previously: 620-680
Chile: 580-640
Previously: 600-660
Peru: 100-150
Platinum Group Metals - M&C by
metal³
Moz
4.4
Pt: 1.7-1.8
Pd: 1.1-1.2
Other: ~0.8
Pt: 1.9-2.1
Previously: 2.0-2.2
Pd: 1.4-1.5
Previously: ~1.4
Other: 0.9-1.0
Pt: 1.9-2.1
Previously: 2.0-2.2
Pd: 1.4-1.5
Previously: 1.4-1.5
Other: 0.9-1.0
4.7-5.1
2023F (New)
Chile: 590-650
Peru: 300-350
Pt: 1.9-2.1
Pd: 1.4-1.5
Other: 0.9-1.0
Platinum Group Metals - Refined
Moz
4.7
2.6-2.7
4.6-5.0
4.2-4.6
Iron ore (Kumba)9
Mt
42
~37
Previously: 37-39
40-41
Previously: 42-43
41-42
41-42
Previously: 42-43
Iron ore (Minas-Rio) 10
Mt
23
23-24
Previously: 22-24
24-26
24-26
25-27
Previously: 23-25
Thermal coal6
Mt
South Africa: 18
Colombia: 9
South Africa: ~15
Colombia: ~4
South Africa: ~16
Colombia: ~8
Previously: ~26Mt total
South Africa: ~16
Colombia: ~8
Previously: ~26Mt total
South Africa: ~16
Colombia: ~8
1. Production is subject to trading conditions and reported on a 100% basis except for the Gahcho Kué joint operation, which is on an attributable 51% basis. Reduction in 2022 as Venetia
completes transition to underground operations.
23
2.
3.
4.
5.
6.
45
7.
8.
Copper business unit only. On a contained-metal basis. Decrease in Chile production from 2022 driven by lower expected grades at Collahuasi and Los Bronces.
5E+ gold produced metal in concentrate ounces. Includes own mined production (~65%) and purchased concentrate volumes (~35%). The split of metals differs for own mined and purchased
concentrate refer to FY2019 results presentation slide 30 for indicative split of own mined volumes.
Total iron ore is the sum of Kumba (dry basis) and Minas-Rio (wet basis).
Excludes thermal coal production in Australia. Lower production in 2020 and 2021 owning to Grosvenor stoppage. Lower volumes in 2022 versus previous guidance owing to revised timing for
the Moranbah-Grosvenor plant expansion project.
Export South Africa including production sold domestically at export parity pricing and Colombia production. Planned divestment of SA thermal coal production capacity expected no later than
May 2022 - May 2023. Lower volumes in 2021 and 2022 versus previous guidance reflecting lower Colombian volumes in response to market demand and revised South African production.
Nickel business unit only. Lower volumes in 2022 versus previous guidance as benefit from bulk ore sorting technology and briquetting is now expected in 2023.
5E+ gold produced refined ounces. Includes own mined production and purchased concentrate volumes. Refer to Anglo American Platinum release for split of guidance by metal.
9. Dry basis. Subject to rail and port performance. Lower guidance from 2021 reflects logistical constraints.
10. Volumes are reported as wet metric tonnes (wmt). Product is shipped with -9 per cent moisture. Pipeline inspections impact 2020 and 2022 volumes.
AngloAmerican
29
29View entire presentation