Investor Presentaiton slide image

Investor Presentaiton

2. 1. Total Hard Rock Saprolite Lola Graphite Project Completed NI 43-101 compliant Bankable Feasibility Study August 2019 by DRA Environmental and mining permit received from Government of Guinea 15 year mining permit awarded on Nov. 2019 for 94 Km2 Resource Estimate (1.65% Cg Cut-Off) 865,000 mN 547,000 m 864,000 MN 863,000 mN 862,000 mN Category Tonnes (Mt) Grade (%Cg) Contained (kt) Measured 6.84 4.39 300.3 861,000 mN Indicated 23.24 4.04 937.9 Inferred 1.20 3.81 45.6 860,000 mN Indicated 15.96 4.03 643.4 859,000 mN Inferred 3.05 3.73 113.8 Meas. & Ind. 46.03 4.09 1,881.6 858,000 mN Inferred 4.25 3.75 159.4 3. 4. Please refer to the technical report filed on SEDAR for full details. 15 Pit shell defined using 30-degree pit slope, $1,400/t of concentrate (96% Cg grade, 75% Cg plant recovery), $1.80/t mining cost, $8.00/t processing cost, $3.50/t G&A and $100/t of concentrate transport costs Mineral resources are not mineral reserves and have no demonstrated economic viability. The estimate of mineral resources may be materially affected by mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors Effective Date of Resource Estimate is June 18, 2019. www.srgmining.com | TSX.V SRG 8.2 Km Legend DDH 2013-17 DDH 2018 Deposit outline Measured Indicated Inferred Open along strike and at depth Mining for tomorrow 551,000 mE SRG Battery Minerals W E
View entire presentation