Lola Graphite Project
Completed NI 43-101 compliant Bankable Feasibility Study
August 2019 by DRA
Environmental and mining permit received from Government of
Guinea
15 year mining permit awarded on Nov. 2019 for 94 Km2
Resource Estimate (1.65% Cg Cut-Off)
865,000 mN
547,000 m
864,000 MN
863,000 mN
862,000 mN
Category
Tonnes (Mt)
Grade (%Cg) Contained (kt)
Measured
6.84
4.39
300.3
861,000 mN
Indicated
23.24
4.04
937.9
Inferred
1.20
3.81
45.6
860,000 mN
Indicated
15.96
4.03
643.4
859,000 mN
Inferred
3.05
3.73
113.8
Meas. & Ind.
46.03
4.09
1,881.6
858,000 mN
Inferred
4.25
3.75
159.4
3.
4.
Please refer to the technical report filed on SEDAR for full details.
15
Pit shell defined using 30-degree pit slope, $1,400/t of concentrate (96% Cg grade, 75% Cg plant recovery), $1.80/t mining cost, $8.00/t
processing cost, $3.50/t G&A and $100/t of concentrate transport costs
Mineral resources are not mineral reserves and have no demonstrated economic viability. The estimate of mineral resources may be
materially affected by mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and
governmental factors
Effective Date of Resource Estimate is June 18, 2019.
www.srgmining.com | TSX.V SRG
8.2 Km
Legend
DDH 2013-17
DDH 2018
Deposit outline
Measured
Indicated
Inferred
Open along strike and at depth
Mining
for tomorrow
551,000 mE
SRG
Battery Minerals
W
EView entire presentation