Investor Presentaiton slide image

Investor Presentaiton

3. The Power Sector in the National Budget for FY2022 . 3.2 Overall allocation for the power sector • • • • Despite being burdened with overcapacity, power sector is continuing to give priority to generation related projects under ADP 62% of the total ADP allocation of power sector is provided for generation (including Ruppur Power Plant) Power sector should shift its allocation from generation towards more on transmission and distribution FY 2022 budget did not give due importance towards generation of renewable energy based power generation At present only 730 MW of electricity generation capacity from renewable energy which is only 2.86% of total generation capacity • PSMP 2016 had aimed to generate 10% of the total capacity from RE within 2025 No new investment under SREDA for RE-based projects Despite the political commitment for phasing out from fossil-fuel based power generation towards clean-energy based power generation, FY 22 budget has failed to address that commitment Sub-sector Distribution of ADP allocation of FY 22 in Power Sector Allocated ADP (Lakh) Generation Tk 28325.4 Transmission Tk 8779.3 Distribution Tk 8,558.6 Total Tk 45663.3 % of total ADP 62.03% 19.23% 18.74% 100% 24 Source: Author's calculation
View entire presentation