ASSET OPTIMISATION
SHEBA OPERATIONS - LOM OF 9 YEARS (19 YEARS
INCLUDING ROYAL SHEBA)
•
Project Dibanisa
·
Forecasted to be completed during FY21
Optimised usage of infrastructure expected to reduce all-
in sustaining cost - targeting -USD1,000/oz
Additional available shaft-time to assist with
development and mining of Royal Sheba
•
Sheba plant available for the processing of surface
material and Royal Sheba uppers in the near future
Royal Sheba Uppers
•
Mining of Royal Sheba uppers identified to assist with
increased production at Sheba Mine
800 Elev
400 Elev
15200 E
15200 E
Process additional surface source material at Sheba
plant to maximise plant capacity
⚫ Exploration
Embark on exploration exercise to identify possible new
high-grade mining areas to mine
Phase 1
Phase 2
Total
15600 E
Phase 1 Mining
Phase 2 Mining
15600 E
Royal Sheba Mineral Resources
PAN AFRICAN
RESOURCES
16000 E
Royal Sheba
orebody and
historical
workings
16000 E
800 Elev
Tonnes (Mt)
Grade (g/t)
Gold (t) Gold (Koz)
1.44
3.60
5.18
167
4.15
3.62
14.99
482
5.58
3.61
20.17
649View entire presentation