Whitehaven Metallurgical Coal Acquisition Presentation
2 Provides significant value upside including
strategic growth options
Blackwater asset improvement
Potential additional saleable production above expected average of 12-13Mtpa via:
■ Optimisation of existing dragline sequence and pre-strip to allow access to latent dragline
capacity
Increasing of dozer push volumes
■ Upgrading of the CHPP to 18Mtpa ROM feed to match mining capacity and facilitate production
of 100% metallurgical coal
◉
Integration of Blackwater South into the sequence
Daunia improvements and synergies with Winchester South
Achieving targeted ~6,600 annualised production hours per truck by FY26 as automated haulage
(AH) ramps up represents value upside
Daunia is adjacent to Whitehaven's Winchester South development project
■ Unlocking synergies between Daunia and Winchester South in management, product blending,
labour sharing, technical expertise in AH and infrastructure
■ Enhanced positioning for further opportunities around this core holding
Clermont
Winchester
South
Koumala
Ilbibie
West Hill
Coppabella
Carmila
Daunia
Mine
Carmila Beach
Flaggy Rock
Dysart
Capella
Mount Stuart
Legend
0
Populated Places
Rail
erald
Mining Leases
Yamala
Blackwater
BMA Assets
Winchester South
0 10 20 30 40 50
Kilometers
Blackwater
Mine
St Lawren
Dingo
Dead
15
WHITEHAVENView entire presentation