NHPC Financial Highlights & Renewable Energy Projects
Installed
Capacity
Under
Construction
Awaiting
Clearances
✰ Power
PHYSICAL SNAPSHOT
Stations under Operation-22 Nos.
(5551 MW*)
Power Stations with Subsidiary (NHDC) - Nos.
(1520 MW)
Total Operational Projects - 24 Nos. (7071 MW)
✰ Projects Under Construction (including
Subsidiary & JV) :-
.
• Hydro & Solar - 14 Nos. (7627 MW)
-
Projects Awaiting Clearances: -
Standalone 5 Nos. (5996 MW)
Joint Venture - 1 No. (930 MW)
Subsidiary 1 No. (66 MW)
•
•
-
5
Hydro Power is 11% (46850 MW) of
All India Installed Capacity (410339
MW**).
NHPC Contribution is 15% of Installed
Hydro Power On Consolidated Basis.
Status
Capacity (MW)
Operational Projects
7,071
Projects Under Construction
7,627
(including Subsidiary & JV)
Projects Under Clearance:
Stand alone
JV Projects
5,996
930
Subsidiaries
66
Projects Under Survey &
Investigation
890
Total
22,580
Under Survey
&Investigation
✰ Projects under Survey & Investigation -
*
MW Solar Power Project, Tamilnadu.
2 Nos. (890 MW)
Including 50 MW Wind Power Project, Jaisalmer & 50
** Source-CEA as on 31.12.2022
एनएचपीसी
NHPCView entire presentation