World-class project attributes SOUTHHARZ POTASH Brownfield optionality provides potential for substantial capital-efficiency benefits Ferna thickness (m) A. 20 15 Plunge 00 12.5 Azimuth 019 0 250 500 750 10 Großbodungen 7.5 3x vertical exaggeration 5 2.5 OHM-02 Haynrode 700 m Confirmation Drillhole (2022) A. OHM-01 Bulk Sample Location Historical Mine Shaft 247 ✰ open closed High-Voltage Line Gas Pipeline (< 250 mm) Motorway Federal Road Railroad AUGUST 2023 Leinefelde 4500 m Worbis 必 B. 38 Bernterode 1 2 3 km KATE Topographic surface B. Potential connecting drit Bernterode.. Shaft Plan view of Ohmgebirge tenement (left) and long section of Ohmgebirge deposit (above, marked A to B on plan view) Shows modelled deposit thickness (red thickest) with historical and recent confirmatory drillholes labelled with black dots and grey lines ☐ Demonstrates the location of existing operational Bernterode shaft (shown with red line) with proposed connecting drift (red dashed line) under brownfield development plan. Note the long section schematic is for illustration purposes only, not representative of final design. INVESTOR PRESENTATION 8
View entire presentation