Investor Presentaiton slide image

Investor Presentaiton

NATURAL GAS DEVELOPMENTS Independently Certified Contingent Gas Resources, net to Pure Hydrogen: 1C: 268 PJ 2C: 546 PJ 3C: 1,041 PJ 100% PROJECT VENUS SURAT BASIN CSG, QUEENSLAND 100% WINDORAH GAS PROJECT - COOPER BASIN GAS 51% PROJECT SEROWE CSG, BOTSWANA (FARMED OUT) 123 Bcf 2C, and 560 PJ in Prospective Resources in the Walloon CSG¹ 330 Bcf 2C and 8.8 TCF Prospective Resources - basin centered gas³ 160 Bcf 2C and Prospective Resource 10.7 TCF CSG4 Plan to use gas resources to manufacture turquoise hydrogen and high value carbon products Refer to the disclaimer for notes Pure Hydrogen 15
View entire presentation