PTTEP Project Details and Financial Performance
E&P Portfolio | Middle East
UAE
Abu Dhabi
Offshore 1
Exploration
Abu Dhabi Offshore 1, 2, 3 (WI 30%)
•
High potential prospective resources with significant
sizeable discoveries
Operated by ENI (WI 70%)
Sharjah Onshore Area A (WI 25%)
. Completely signed a Farm-in/Farm-out Agreement
.
Operated by ENI (WI 50%)
Sharjah Onshore Area C (WI 25%)
• High gas & condensate potential with the possibility of
•
integrating with surrounding fields
Operated by ENI (WI 50%)
Midstream
ADNOC Gas Processing (WI 2%)
• AGP is one of the largest gas processing complexes in the
world (total capacity of 8 BCFD)
• JV: 3 plants with capacity of 1.2 BCFD
• ADNOC: 2 plants with capacity of 6.9 BCFD
• Essential to Abu Dhabi and UAE economy
• Sizable volume of Propane, Butane and Naphtha
• Operated by ADNOC (WI 68%)
Abu Dhabi
Offshore 2
Production phase
Exploration phase
Midstream
Abu Dhabi
Offshore 3
AGP
OMAN
PTTEP
Sharjah
Onshore Area C
OLNG
Production
Block 6 (PDO) (WI 2%)
•
Largest asset covering around 1/3 of the country. Average
oil production volume of 648 KBPD (3M2023)
Operated by Petroleum Development of Oman
Block 53 (WI 1%)
• Largest single onshore producing field in Oman. Average
oil production volume of 86 KBPD (3M2023)
• Operated by Occidental (WI 47%)
Block 61 (WI 20%)
• Largest tight gas development in Middle East
• Gas and condensate daily production rate of 1,460 MMSCFD
and 56 KBPD (3M2023).
PDO (Block 6)
UAE
Oman Onshore
Oman Block 61
OMAN
Block 12
26
26
Mukhaizna
(Block 53)
•
Operated by BP (WI 40%)
Exploration
Onshore Block 12 (WI 20%)
• Operated by Total E&P Oman (WI 80%)
Midstream
OMAN LNG (WI 2%)
• The only LNG facility in Oman.
Operated by Government of Oman (WI 51%)View entire presentation