Investor Presentaiton slide image

Investor Presentaiton

Constancia Mine Plan Summary HUDBAY MINE PLAN SUMMARY - NOVEMBER 21, 2016 TECHNICAL REPORT 2017E 2018E 2019E 2020E 2021E 5-Yr Avg. Yr 6-19 Avg.1 LOM Avg.1 Ore mined million tonnes 34.6 34.1 27.7 32.2 31.8 32.1 30.1 30.5 Waste mined million tonnes 38.4 39.1 33.8 36.9 37.0 37.0 33.1 34.0 Strip ratio waste:ore 1.1 1.1 1.2 1.1 1.2 1.2 1.1 1.1 Ore milled million tonnes 30.9 31.0 30.9 31.0 30.9 30.9 30.6 30.7 Copper grade milled % Cu 0.41% 0.39% 0.44% 0.40% 0.42% 0.41% 0.26% 0.30% Copper recovery % Cu 85.0% 86.0% 86.6% 87.0% 87.1% 86.3% 89.9% 88.6% Copper production² 000 tonnes 107 104 118 107 113 110 71 81 Molybdenum 000 tonnes 0.3 1.7 1.9 2.1 1.8 1.6 1.5 1.5 production2 Gold production² 000 oz 23 40 94 81 102 68 22 34 Silver production² 000 oz 2,848 2,523 2,577 2,667 3,232 2,770 1,853 2,090 On-site costs³ $/t milled $7.84 $7.53 $7.74 $7.55 $7.80 $7.69 $7.27 $7.39 Cash cost4 $/lb Cu $1.30 $1.09 $0.81 $0.86 $0.83 $0.97 $1.45 $1.28 Sustaining cash cost $/lb Cu $1.83 $1.34 $1.01 $1.15 $1.08 $1.27 $1.80 $1.62 CAPITAL COSTS: Sustaining capex $ million $103 $34 $42 $51 $48 $55 $36 $41 Capitalized stripping $ million $18 $17 $5 $15 $13 $14 $17 $16 Total sustaining capex $ million $121 $51 $47 $66 $61 $69 $53 $57 Pampacancha capex $ million $11 $29 $13 $1 $1 $11 Source: The Constancia Mine, National Instrument 43-101 Technical Report as filed on SEDAR by Hudbay on November 21, 2016. 1. Year 6-19 average calculated from 2022-2035; life-of-mine ("LOM") average calculated from 2017-2035. 2. Production refers to contained metal in concentrate. 3. On-site costs include mining, milling and G&A costs, and include the impact of capitalized stripping. 4. Cash cost and sustaining cash cost are reported net of by-product credits, are calculated at reserve prices ($3.00/lb Cu, $11.00/lb Mo, $18.00/oz Ag, $1,260/oz Au) and include the impact of the precious metals stream and capitalized stripping. Cash cost includes on-site and off-site costs, and sustaining cash cost includes the addition of royalties and sustaining capital, but excludes Pampacancha project capital. 26
View entire presentation