Milestones and Path Forward
2022
IPO
Kopsa Project: 4,240m drilled
Kiimala Trend Project: 695m drilled
Reported drill results 2022 drilling
Kopsa auxiliary mine area permit
application
IP survey at Kopsa
2023
Kopsa 2023 MRE
Acquisition of Hirsikangas project
Kopsa: 2,000m drilled
Kiimala Trend: 300m drilled
Bottom-ot-till drilling and soil
geochemisty sampling arosss all project
areas
FLEM survey at Kopsa
2024
Kopsa 2024 MRE
Expected decision on Kopsa auxilliary
area mine permit
Report results of FLEM survey at Kopsa
Report 2022 regional exploration results,
including bottom-of-till and soil sampling
results.
2024 exploration plans (To Be Determined)
2025
2024 drill program (TBD) Kopsa 2025 MRE (TBD)
Kopsa PEA update (TBD)
3.00
2.50
2.00
1.50
1.00
0.48
0.50
0.00
0.79
0.99
2022
2023
(inherited resources)
(Hirsikangas acquisition and Kopsa 2023 MRE)
2024
(Kopsa 2024 MRE)
2025