Investor Presentaiton
Port of Ondo Bill of Quantities
The initial investment requirement is USD 1.3 billion.
Bill of Quantities Summary
Preliminary Costs
Engineering and supervision
Moblisation
Civil Works
M USD
98.6
32.9
65.7
1,057.6
Dredging and Reclamation
273.8
Civil Works and Buildings
431.5
Landside Connection with FTZ
116.3
Contingencies
236.0
Equipment
154.3
General
1.4
Container Terminal
74.4
Multi-Purpose Terminal
18.4
RoRo Terminal
0.3
Offshore Terminal
6.9
Cement Terminal
9.0
Bitumen Berths
5.0
Buildings
Worksh
Marine Services
19.8
IT
5.0
Contingencies
14.0
Grand Total
1,310.4
24 24-01-2019 | Port of Ondo | Final Report Presentation
Key
Pavement
Unpaved
Future
Buildings
Amenity Building
Shunting yard
Funk Sum
OOG
Crane Per Substation
Gate
Wwwhouse
Open storage
Fire Station
Tugba Marine Workshop
Silos
RoRo
Reefer area
Container area