Port of Ondo Bill of Quantities The initial investment requirement is USD 1.3 billion. Bill of Quantities Summary Preliminary Costs Engineering and supervision Moblisation Civil Works M USD 98.6 32.9 65.7 1,057.6 Dredging and Reclamation 273.8 Civil Works and Buildings 431.5 Landside Connection with FTZ 116.3 Contingencies 236.0 Equipment 154.3 General 1.4 Container Terminal 74.4 Multi-Purpose Terminal 18.4 RoRo Terminal 0.3 Offshore Terminal 6.9 Cement Terminal 9.0 Bitumen Berths 5.0 Buildings Worksh Marine Services 19.8 IT 5.0 Contingencies 14.0 Grand Total 1,310.4 24 24-01-2019 | Port of Ondo | Final Report Presentation Key Pavement Unpaved Future Buildings Amenity Building Shunting yard Funk Sum OOG Crane Per Substation Gate Wwwhouse Open storage Fire Station Tugba Marine Workshop Silos RoRo Reefer area Container area mtbs