Investor Presentaiton slide image

Investor Presentaiton

4. 5. Has the entity implemented a mechanism for zero liquid discharge? If yes, provide details of its coverage and implementation. All our units have Zero Liquid discharges mechanism as specified by the Pollution Control Board of respective states in their consent except Kottayam unit. In rainy seasons, Kottayam unit is permitted to discharge excess treated effluent if any as specified in their consent. Please provide details of air emissions (other than Greenhouse Gas emissions ("GHG")) by the entity: Parameter Unit NOX µg/m3 FY 2022-23 Min: 11 Max: 62 FY 2021-22 Min: 3 Max: 39 SOX μg/m3 Min: 4 Max: 39 Particulate matter (PM) μg/m3 PM2.5- Min: 10 - Max: 58/ PM10 - Min: 29 Max: 98 Min: 4 Max: 38 PM2.5- Min: 10 - Max: 77/PM10 - Min: 25 Max: 96 Persistent organic pollutants (POP) NA NA Volatile organic compounds (VOC) mg/m3 Hazardous air pollutants (HAP) Others - ozone-depleting substances NA We are in the process of establishing monitoring systems across all our plants. Below Detection Level Below Detection Level NA (HCFC 22 or R-22) 6. Provide details of greenhouse gas emissions (Scope 1 and Scope 2 emissions) and its intensity: Parameter Total Scope 1 emissions (Break-up of the GHG into CO2, CH4, N2O, HFCs, PFCs, SF6, NF3, if available) Total Scope 2 emissions (Break-up of the GHG into CO2, CH4, N2O, HFCs, PFCs, SF6, NF3, if available) Unit Metric tonnes of CO₂ equivalent FY 2022-23 567325 FY 2021-22 526290 Metric tonnes of CO₂ equivalent 603254 633588 Total Scope 1 and Scope 2 emissions per rupee of turnover Metric tonnes of CO₂ equivalent/Cr. 51.85 61.08 7. Does the entity have any project related to reducing greenhouse gas emission? If yes, then provide details. Yes, following are the overview of current projects and initiatives in reducing greenhouse gas emission: . • All plants are adopting specific power consumption and specific fuel consumption measures for the reduction of GHG emissions. Horizontal deployment of nitrogen gas-based process in place of hot water system. All plants are adopting specific water consumption reduction. 74 Future Endeavours: . MRF has signed agreement for purchasing of 20MW solar power for Tamil Nadu plants and 7.5MW hybrid (Solar and Wind) power for Gujarat plant which will reduce its carbon footprint in future.
View entire presentation