Massive Sulphide Project Overview slide image

Massive Sulphide Project Overview

2019 DRILLING: MAIN ZONE - EXTENSION TARGET (PAD 5) - Cross Section B-B' & Selected Drilling Results ■ Results illustrate scale along with elevated grades ■ Mineralization continues to be intersected over significant widths with extremely high grades. ■ 3.1km of strike length leaves room to build tonnage 1400 m Location A: 563127, 7153511 B: 563011, 7153696 PAD 5: YKDD19-039, 040, 042, 043 & 046 Section Azimuth 150 - View Looking WSW YKDD19-039 EOH 121 m Scale: 1:1,500 Vertical exaggeration: 1x Om 50m YKDD19-040 EOH 152 m True Length Au Pb Zn Cu Mn Hole Width (m) (g/t) (%) (%) (%) (%) (m) YKDD19-042 EOH = 182 m YKDD19-040 26.5 16.32 153.57 3.10 2.44 0.42 4.09 YKDD19-042 28.3 14.15 113.96 9.34 12.37 0.09 3.05 Legend And 4.0 2.00 150.50 7.39 36.96 0.05 2.53 Mineralized Zone < 5% And 3.0 1.50 213.33 10.73 41.43 0.10 1.41 Mineralized Zone >/= 5% Mineralized Zone undefined % YKDD19-043 YKDD19-043 22.6 8.47 48.20 8.20 4.90 0.04 3.20 EOH = 254 m Working Model Mineralized Zone Including 3.0 1.12 55.33 21.91 1.48 0.01 4.07 Ag (g/t) And 1.1 0.41 235.40 49.30 3.72 0.11 1.99 0 7.5 15 22.5 30 + And 3.1 1.16 97.47 6.87 21.23 0.05 3.02 *See press releases dated November 5, 2019 CANTEX TSXV: CD Pb+Zn (%) ° 1.8 3.5 5.3 1200 m x: 563127 m y: 7153511 m Collar: 563032 E/7153663 N/ 1524 Elevation YKDD19-046 EOH = 287 m Assays outstanding for YKDD19-046 B 1400 m 1200 m x: 563043 m y: 7153645 m 11
View entire presentation