NHPC Financial Highlights & Renewable Energy Projects
NHPC: Projects Under Construction
Project Under Construction-Standalone
Provisional
एनएचपीसी
NHPC
28
Installed
NHPC Project
Capacity
(MW)
Design
Energy
(MU)
Type of the
project
CCEA Estimated
Cost (Rs. Crore)
(Price Level)
Anticipated
Project Cost (Rs.
Crore)
Project
Expenditure till
-Dec'22 (Rs.
Crore)
Expected
Commissioning
Schedule
Subansiri Lower (8X250)
2000
7422
Assam/ Ar. Pradesh
Run of River with
small pondage
6285.33 (Dec'02)
19992.43 (Jan'20)
17,005.85
FY 24-25 (Q-1)
Parbati II (4X200)
800
3124
Himachal Pradesh
Run of River with
small pondage
3919.59 (Dec'01)
11134.54 (July'22)
10,157.53
FY 23-24 (Q-3)
Total (A)
2800
10546
10204.92
31126.97
27,163.38
Project Under Construction- JV
Installed
Design
NHPC Project
Capacity
Energy
Type of the
project
(MW)
(MU)
CCEA Estimated
Cost (Rs. Crore)
(Price Level)
Anticipated
Project Cost (Rs.
Crore)
Provisional
Project
Expenditure till
-Dec'22 (Rs.
Crore)
Expected
Commissioning
Schedule
Pakal Dul (4X250)
1000
3230
Run of River
8112.12 (Mar'13)
8112.12 (Mar' 13)
2,706.33
FY 25-26 (Q-2)
UT of J&K
Kiru (4X156)
624
2272
Run of River
4287.59 (July'18)
4287.59 (July'18)
900.10
FY 25-26 (Q-2)
UT of J&K
Kwar (4x135)
540
1975
Run of River
4526.12 (Sept.20)
4526.12(Sept.20)
243.56
FY 26-27 (Q-3)
UT of J&K
Total (B)
2164
7477
16925.83
16925.83
3,849.99View entire presentation