NHPC Renewable Energy and Pump Storage Project Updates
NHPC: Projects Under Construction
Project Under Construction-Subsidiary
Installed
Design
CCEA
Estimated
NHPC Project
Capacity
Energy
Type of the
project
(MW)
(MU)
Cost (Rs.
Crore) (Price
Level)
Anticipated
Project Cost
(Rs. Crore)
Provisional
Project
Expenditure till
- June'23 (Rs.
Crore)
34
एनएचपीसी
NHPC
Expected
Commissioning
Schedule
Pakal Dul, (4X250)
8112.12
8112.12
1000
3230
Run of River
3128.19
FY 26-27 (Q-2)
UT of J&K
(Mar'13)
(Mar'13)
Kiru, (4X156)
4287.59
4287.59
624
2272
Run of River
1119.04
FY 25-26 (Q-4)
UT of J&K
(July'18)
(July'18)
Kwar, (4x135)
4526.12
540
1975
Run of River
UT of J&K
(Sept.20)
4526.12
(Sept.20)
424.42
FY 26-27 (Q-3)
Teesta-VI, (4X125)
5748.04
5748.04
500
2400
Run of River
2541.05
FY 26-27 (Q-2)
Sikkim
(July'18)
(July'18)
Run of River
Rangit-IV, (3X40)
938.29
938.29
120
508
with small
623.30
FY 24-25 (Q-2)
Sikkim
(Oct' 19)
(Oct' 19)
pondage
Ratle, (4X205+30)
5281.94
850
3137
Run of River
UT of J&K
(Nov'18)
5281.94
(Nov'18)
315.69
FY 26-27 (Q-1)
Total (B)
3634
13522
28894.10
28894.10
8151.69
Total (A+B)
9314
35291
70975.41
93152.57
39790.09View entire presentation