Japan Gold Corp. Corporate Presentation March 2024 slide image

Japan Gold Corp. Corporate Presentation March 2024

BARRICK ALLIANCE PROJECTS Advancing a Pipeline of Prospects Ebino 15,741 ha 00 Togi 3,990 ha Hakuryu 4,901 ha Aibetsu 14,646 ha 00 Kyushu Mizobe 5,163 ha Honshu Hokkaido Sumitomo Metal Mining Co. Ltd. Hishikari Mine 7 Japan Gold Corp. | Corporate Presentation | March 2024 Mizobe • 2,416.2 m drilling completed in 7 drill holes Drilling has shown a large, concealed, multi-phase hydrothermal system, currently 2.5 by 1.5 kms Ebino • Target summary and drill proposal being evaluated Togi • • Mapping completed advanced geological interpretation and identified the potential for concealed targets along a 4 km normal fault zone NE of the Mori vein workings, a target area named as 'Akasaka Target' 8-line km CSAMT confirmed resistivity & conductivity features associated with the inferred normal fault zone . Ground magnetics planned for 2024 to further refine drill targets Aibetsu • • ~25-line km of line clearing completed defined 5 by 4 km alteration system 16.3-line km of CSAMT and 25-line km of soil samples completed • Results indicate the NE ridge target as a priority target zone • • 106 samples covering the main anomalous target on the NE ridge being evaluated Subject to evaluation, a drill program may follow Hakuryu • 21.2 km of lines were cleared on the project area for planned geophysical surveys Detailed mapping confirms preservation and prospectivity in areas with limited mining & production • Ground magnetics planned towards proposed drill targeting in 2024 JAPAN GOLD CORP.
View entire presentation