Japan Gold Corp. Corporate Presentation March 2024
BARRICK ALLIANCE PROJECTS
Advancing a Pipeline of Prospects
Ebino
15,741 ha
00
Togi
3,990 ha
Hakuryu
4,901 ha
Aibetsu
14,646 ha
00
Kyushu
Mizobe
5,163 ha
Honshu
Hokkaido
Sumitomo Metal Mining Co. Ltd.
Hishikari Mine
7 Japan Gold Corp. | Corporate Presentation | March 2024
Mizobe
•
2,416.2 m drilling completed in 7 drill holes
Drilling has shown a large, concealed, multi-phase hydrothermal system, currently 2.5 by
1.5 kms
Ebino
•
Target summary and drill proposal being evaluated
Togi
•
•
Mapping completed advanced geological interpretation and identified the potential for
concealed targets along a 4 km normal fault zone NE of the Mori vein workings, a target
area named as 'Akasaka Target'
8-line km CSAMT confirmed resistivity & conductivity features associated with the inferred
normal fault zone
.
Ground magnetics planned for 2024 to further refine drill targets
Aibetsu
•
•
~25-line km of line clearing completed defined 5 by 4 km alteration system
16.3-line km of CSAMT and 25-line km of soil samples completed
•
Results indicate the NE ridge target as a priority target zone
•
•
106 samples covering the main anomalous target on the NE ridge being evaluated
Subject to evaluation, a drill program may follow
Hakuryu
•
21.2 km of lines were cleared on the project area for planned geophysical surveys
Detailed mapping confirms preservation and prospectivity in areas with limited mining &
production
•
Ground magnetics planned towards proposed drill targeting in 2024
JAPAN
GOLD
CORP.View entire presentation