Massive Sulphide Project Overview slide image

Massive Sulphide Project Overview

TIMELINE TO DISCOVERY 4 2016 Late season drill program on Extension Zone intersects oxidized mineralization near surface 3 2016 2 2015 1 2014 Prospecting of anomalous soil-talus samples led to the Discovery Zone Expanded prospecting and rock sampling program extend mineralization by ~1km along strike Trenching of Discovery Zone extends mineralization 2km towards the "Extension Zone" 6.5 5 2018 6.0 Drill program tests 5.5 fresh mineralization at depth- 5.0 mineralized zones 4.5 average >20% Lead-Zinc with 4.0 additional 100g/t 3.5 Silver Det Apr Jul Oct Apr Jul Oct Apr Jul Oct Apr Jul Oct Apr Jul 14 2015 2016 2017 2018 2019 CANTEX TSXV: CD 3.0 2.5 2.0 1.5 1.0 0.5 LO 5
View entire presentation