Strategic Priorities and Growth Outlook slide image

Strategic Priorities and Growth Outlook

Steel Business SARDA SARDA ENERGY & MINERALS LTD. Iron ore Pellet Sponge Iron Billet • • • Iron ore mines near SEML plant in Siltara Production run rate of 5 lakh tonne with mine life of 30 years Pellets are produced from Iron Ore Fines and majority is sold in local markets, remaining is consumed captively for production of Sponge Iron. The capacity of the pellet plant is 6lakh tonne Sponge Iron is produced from Captive Iron Ore Lumps and Pellets Sponge Iron capacity is 3.6 lakh tonne Billets are semi finished steel products produced by continuous casting process Billet production capacity is 2 lakh tonne Wire Rods are hot rolled products made from direct hot billet charging Wire Rod & HB Wire • Wire Rods production capacity is 1.8 lakh MT's • Wire Rods are cold drawn to produce HB Wires Eco Bricks • Eco-Bricks are mainly manufactured from fly-ash and waste generated from the power plant Company's annual production capacity is 1.3 lakh tonne 11
View entire presentation