Areas of Concern slide image

Areas of Concern

Hackett River Project Proposal Regulatory Progress Hackett River Project Proposal was submitted to the Nunavut Impact Review Board (NIRB) in 2008 о Described intent to mine in the Hackett River Area Conceptual Infrastructure – Layout Option 1 о Provided an overview of the types of activities and infrastructure to allow the NIRB to determine whether a full Part 5 public review would be recommended for the Project, and to assist the development of Draft Environmental Impact Statement (EIS) guidelines Project will evolve in consideration of ongoing exploration, improved economics and optimization Approval Process: During the recommended review process, the conceptual project is further defined and primary project components assessed The further defined Project is presented in the submission of a Draft then Final EIS, including supplementary information submissions and comment responses as a result of: Bulk Storage and Waste Storage о Development of project thinking/engineering о Analytical assessment of alternatives for each project component о Minimization of environmental risks (through design, management and mitigation) ° Identification of project efficiencies and optimizations, and о Consideration of Regulatory, Designated Inuit Organization and stakeholder concerns If approved, further refinement would take place during project permitting (e.g., during application for a water license), construction and/or during project amendments Glencore - September 2022 AN Storage Degaulle Lake Potential Potable Water Reservoir Emulsion Plant Banana Lake Hungrat Lake Bat Lake Waste Dump 1 Mill Building Laydown Big Toe Pond Main Zone Pit Boot Construction Pit Primary Crusher Camp Finger Lake Waste Dump 2 Laydown Camp aka Potential Water Intake >>>>> Esker Fuel Farm/Dispenser Truckshop Proposed BIPR Road Access Road to BIPR Q Quarry Pit Airstrip Building Site Infrastructure Dyke Tailings Management Facility Waste Rock Pile GLENCORE
View entire presentation