Areas of Concern
Hackett River
Project Proposal
Regulatory Progress
Hackett River Project Proposal was submitted to the Nunavut Impact Review Board (NIRB) in 2008
о
Described intent to mine in the Hackett River Area
Conceptual Infrastructure – Layout Option 1
о
Provided an overview of the types of activities and infrastructure to allow the NIRB to determine
whether a full Part 5 public review would be recommended for the Project, and to assist the
development of Draft Environmental Impact Statement (EIS) guidelines
Project will evolve in consideration of ongoing exploration, improved economics and optimization
Approval Process:
During the recommended review process, the conceptual project is further defined and primary project
components assessed
The further defined Project is presented in the submission of a Draft then Final EIS, including
supplementary information submissions and comment responses as a result of:
Bulk Storage
and
Waste Storage
о
Development of project thinking/engineering
о
Analytical assessment of alternatives for each project component
о
Minimization of environmental risks (through design, management and mitigation)
°
Identification of project efficiencies and optimizations, and
о
Consideration of Regulatory, Designated Inuit Organization and stakeholder concerns
If approved, further refinement would take place during project permitting (e.g., during application for a
water license), construction and/or during project amendments
Glencore - September 2022
AN Storage
Degaulle
Lake
Potential Potable
Water Reservoir
Emulsion Plant
Banana
Lake
Hungrat Lake
Bat
Lake
Waste Dump 1
Mill
Building
Laydown
Big Toe
Pond
Main Zone Pit
Boot
Construction
Pit Primary
Crusher
Camp
Finger Lake
Waste
Dump 2
Laydown
Camp
aka
Potential Water Intake
>>>>> Esker
Fuel Farm/Dispenser
Truckshop
Proposed BIPR Road
Access Road to BIPR
Q
Quarry
Pit
Airstrip
Building
Site Infrastructure
Dyke
Tailings Management Facility
Waste Rock Pile
GLENCOREView entire presentation