ONGC Projects and Financial Performance

ओएनजीसी ongc Indradhanush Gas Grid Limited (IGGL) A Joint venture with Shareholding - ONGC-20%, IOCL-20%, GAIL-20%, OIL-20%, NRL-20% North-East Natural Gas Pipeline Grid I Manas nal Park Pakhul Tiger Res Itanagar 20 Kms/12" Mali Sivasagar Samdrup Gangtok DT-1 with Compressor 126 Kms/24" 702 Dhalaibil Gohpur Bo Lahing 130 Orang Rowta Kms/12" Taznur Numaligarh on th 129 Dergaon (Jorhat) Batshar 27 Sipaib 230 Kms/24" Nagaon 40 Kms/24" Merapani 7028 Barpe 3 Senna Mokokchung 129 Kms/12" ** Tuensang Guahati DT-2 without Compressor Charipara Wokha 702 215 → IGGL 7553 आज़ादी का अमृत महोत्सव Indradhanush Gas Grid Limited (IGGL) incorporated on 10th August 2018 Implementing Northeast Gas Grid (NEGG), 1,656 Km long natural gas pipeline grid spanning across all North-Eastern states, at an estimated cost of INR 9,265 crores Indradhanush Gas Grid Limited CCEA approved VGF/ Capital Grant of INR 5,559 Crore for NEGG project Gas grid shall connect from Barauni-Guwahati natural gas pipeline as part of Urja-Ganga scheme 3-phase implementation with expected completion by 2024: Phase-1: 557 kms (in 5 sections) ara Siliguri Hkamti AHI Guwahati Dongkamukam 100 Kms/18" 627 Diphu Dipur Dimapur Ashu Igha 627 Shillor Barato 80 Kms/12" Kohima 27 Kohima 22 Kms/12" Peren 1294 627 1024 Hta Man Thi Source Pipeline: Shillong Barauni to Guwahati Mawsynram 120 Kms/18" Dawki Forest 27 150 Kms/12" pat IGGL Madhyanagar Sunamganj Bazar সুনামগঞ্জ Sylhet সিলেট Imphal মধ্যনগর ৰাজার 137 In al Barlekha Kendua কেন্দুয়া Pipeline Detail 88 Kms/18" ailandi Silchar 2 Thoubal Length Total Length (Km) (Km) GAIL's BGPL Habiganj হবিগঞ্জ N207 Panisagar Sreemangal 129 Kms/12" 10 rsingdi fresh Dwarbond Pallel Maman Leikal NEGG Phase-I Churachandpur AH ML: 545 SL:5 550 550 306A M NEGG Phase-II ML: 548 576 111 Kms/12" 1028 SL:28 Khawdungsel NEGG Phase-III ML: 360 360 SL: Nil gartala আগরতলা। N102 Awl Agartala Aizwal Feeder Line 170 170 Kham ML: 1453 Total SL: 33 1656 FL: 170 Phase-2: 719 kms (in 7 sections) Phase-3: 304 kms (in 2 sections) Google Tedim Serchhip Champhai Physical progress of project is 43% as on 31.03.2022 37 37
View entire presentation