Investor Presentaiton slide image

Investor Presentaiton

NATENERGY: KAHRABA NatEnergy ■ Kahraba owns and operates two central power generation plants with an installed capacity of 115 MW in Borg Al-Arab Industrial Zone in Alexandria and 2 smaller Independent power generation Plants. - During 2022, Kahraba invested an additional US$ 10 mln to acquire 20 MW power generation capacity. The additional capacity I anticipated to be commissioned in Q4 2023 increasing total installed power generation capacity to 135 MW. ■ Kahraba's distribution capacity was 325 MW as of June 2023, and is anticipated to reach 345 MW by Q1 2024, and 645 MW by 2030 following the new concession in the 10th of Ramadan South Industrial Developers Zone awarded in December 2022 ■In Oct 2023, Kahraba won a tender issued by Centamin, the operator the Sukari Gold Mine one of the world's largest producing gold mines to build a 50MW onsite substation and high-voltage power distribution lines as well as a long-term contract for the operation and maintenance of the facilities. One of Kahraba's Power Generation Plants In Borg El Arab Kahraba's Actual Electricity Distribution Volume (million KWH) 693 707 578 2021 2022 9M 2023 Kahraba's Installed Generation Capacity in MW 135 115 20 20 115 95 2021 2023e EKH Egypt Kuwait Holding Egypt Kuwait Holding | Investor Presentation 12 112
View entire presentation