NATENERGY: KAHRABA
NatEnergy
■ Kahraba owns and operates two central
power generation plants with an installed
capacity of 115 MW in Borg Al-Arab Industrial
Zone in Alexandria and 2 smaller Independent
power generation Plants.
-
During 2022, Kahraba invested an additional
US$ 10 mln to acquire 20 MW power
generation capacity. The additional capacity I
anticipated to be commissioned in Q4 2023
increasing total installed power generation
capacity to 135 MW.
■ Kahraba's distribution capacity was 325 MW
as of June 2023, and is anticipated to reach
345 MW by Q1 2024, and 645 MW by 2030
following the new concession in the 10th of
Ramadan South Industrial Developers Zone
awarded in December 2022
■In Oct 2023, Kahraba won a tender issued by
Centamin, the operator the Sukari Gold Mine
one of the world's largest producing gold
mines to build a 50MW onsite substation
and high-voltage power distribution lines as
well as a long-term contract for the operation
and maintenance of the facilities.
One of Kahraba's Power Generation Plants In Borg El Arab
Kahraba's Actual Electricity
Distribution Volume
(million KWH)
693
707
578
2021
2022
9M 2023
Kahraba's Installed
Generation Capacity in MW
135
115
20
20
115
95
2021
2023e
EKH
Egypt Kuwait Holding
Egypt Kuwait Holding | Investor Presentation
12
112View entire presentation