Investor Presentaiton slide image

Investor Presentaiton

2. State of the Power Sector during FY2021 2.2 Power generation during FY2021: Efficiency analysis • . • Over generation capacity remains a concerning issue With the rise in generation capacity and slow rise of T&D access, the over generation capacity is likely to increase further Different types of power plants are being used for power generation despite having excess capacity . • • Rental PP operate with a capacity of 1300 MW A number of dated and inefficient power plants operate in public PP and private PP These plants have been targeted to be phased out Without creating scope by phasing out plants, private investment in the RE based power generation would be unviable Over generation capacity % of share of over capacity of installed capacity 24.27% Total installed capacity Over capacity (as per max. Year (MW) generation) 2000-01 4005 972 2010-11 7264 2374 32.68% 2015-16 12365 3329 26.92% 2018-19 18610 6068 32.60% 2019-20 20383 7645 37.51% 2020-21 22023 8231 37.37% Source: Author's calculation based on BPDB data Power plants under different ownership Ownership 2021 2020 No of plants Electricity generation No of plants Electricity generation Public PP 76 9568 57 10146 Joint venture 1 771 1 1244 IPP 49 7583 71 8172 Rental PP 21 1301 20 1301 Imported 1160 1160 Total 147 20383 149 22023 Source: BPDB
View entire presentation