KMI: 2020 Guidance - Published Budget slide image

KMI: 2020 Guidance - Published Budget

Products Segment Overview Strategic footprint with significant cash flow generation Asset Summary Pipelines(a); Jet Fuel ~9,500 Miles 2018 throughput(a) ~2.3 mmbbld Condensate processing capacity 100 mbbld West Coast Terminals Transmix 5 facilities Oregon Line Terminals: 67 Terminals Terminals tank capacity -39 mmbbls Pipeline tank capacity ~15 mmbbls North Line 2019B EBDA (b): ~$1.3 billion Project Backlog: $0.1 billion to be completed in 2019-2020 (c) ■ Various Bakken crude gathering projects Plantation Roanoke expansion KMCC connection with Gray Oak pipeline from Permian Basin Multiple refined products terminaling projects Calnev West Line San Diego Line Double H East Line Hiland Crude KINDER MORGAN A Refined Products Pipelines Refined Products Terminals Transmix Facilities Crude Pipelines Crude Terminals Condensate Splitter Plantation Camino Real CFPL Condensate Splitter Double Eagle KMCC Volumes and mileage include SFPP, CALNEV, Central Florida, Plantation Pipe Line (KM share), KMCC, Camino Real, Double Eagle (KM share), Double H and Hiland Crude Gathering. b) 2019 budgeted Adjusted Segment EBDA plus KM share of JV DD&A. See Non-GAAP Financial Measures and Reconciliations. c) Includes KM share of non-wholly owned projects. Includes projects currently under construction. 40
View entire presentation