Investor Presentaiton slide image

Investor Presentaiton

PARALLEL MINING TSX-V: PAL Garsay Gold Project - Exploration Results Hole # Date Zone (m) From To (m) Intercept (m) Au (est true) From To Intercept (m) Au Hole # Date Zone (g/t) (m) (m) (est true) (g/t) GRC03 2 2012 N 70 72 2 (1.4) 178.50 incl. 42 46 4 (2.8) 5.33 GRC05 2012 SW 72 76 4 (2.8) 2.75 and 87 95 8 (5.7) 1.76 6 and 83 86 3 (2.1) 13.17 and 101 102 1 (0.7) 11.00 GRC05 2012 SW 7 30 31 1 (0.7) 14.40 GDD04 2013 SE 81 82 1 (0.7) 11.15 and 45 47 2 (1.4) 3.82 and 86 92 6 (4.2) 1.98 and 70 72 2 (1.4) 4.46 and 104 109 5 (3.5) 1.52 and 89 102 13 (9.1) 4.58 and 183.22 183.78 0.56 (0.4) 10.35 incl. 92 2 96 4 (2.8) 11.16 GDD00 7 2013 107 114 7 (4.9) 1.71 GDD03 2013 SE 50.66 53 2.34 (1.4) 5.90 and 130 136 6 (4.2) 3.72 and 113 14 (9.8) 5.55 and 193 194 1 (0.7) 18.8 incl. 105 108 3 (2.1) 19.42 GDD00 8 2013 13 N 1 173 174 1 (0.7) 8.73 SW 250 253 3 (2.1) 20.37 and 185 190 5 (3.5) 3.20 GDD01 2013 SW 42 51 9 (6.3) 3.09 and 217 219 2 (1.4) 4.43 From 2010-2013 Newmont Mining spent over US$2 million on geophysics, soil and pit sampling, and 166 drill holes totaling 12,355m* * 6 Newmont exploration results have not been verified by a Qualified Person and should be treated as historical.
View entire presentation