The Power of Agility slide image

The Power of Agility

9.3 mmt annual operating capacity across 11 plants and 6 production sites Production Sites Global Office Locations • Distribution Terminals and Storage Facilities -Shipping Lanes Seoul Beijing Tokyo Shanghai Hong Kong New Zealand New Plymouth Vancouver Medicine Hat Brussels Dallas Geismar Trinidad and Tobago Santiago Punta Arenas Operating capacity Number of plants² Gas supply (mmt)1 0.64 1 Fixed price contract Financial hedges, fixed 2.203 2 price contracts, Damietta Cairo and spot market Dubai Methanol price linked 0.63 1 contract Methanol price linked 1.96 2 contract 2.20 3 Methanol price linked contract 1.70 2 Methanol price linked contract Currently building a third 1.8M tonne plant in Geismar with commercial operations in late 2023/early 2024 which will increase the site operating capacity to 4M tonnes Total 9.3 11 6 1 Annual operating capacity reflects, among other things, average expected plant outages, turnarounds and average age of the facility's catalyst. Actual production for a facility in any given year may be higher or lower than operating capacity due to several factors, including natural gas composition or the age of the facility's catalyst. Methanex's share shown for Trinidad (Atlas 63%) and Egypt (50%). 2 Waitara Valley plant in New Zealand and Titan plant in Trinidad are currently idled due to natural gas availability. methanex the power of agility
View entire presentation