CONCEPTUAL PLANT DESIGN Layout based on capacity for 40ktpa LCE production DLE Area Boron Removal Area Admin, warehousing and workshops -7430000mN LCE Production Water and Steam Services Brine Holding Ponds 343000mE Mother Liquor Ponds 2 Strings (K1, K2, K3, K4) Evaporation Ponds Option 1 345000mE Payo 2 Payo 1 North Existing Route 70 3950 3945 3940 PC-1 PC-2 3935 3930 Mother Liquor Ponds 2 Strings (K1, K2, K3, K4) 3925 LIME-1 LIME-1 K1-1 K1-2 Process Plant 3920 K2-1 K2-2 K3-2 K3-1 Li-1 Li-2 Process Plant Silvia Irene 3955 3950 3945 PC-2 -7425000mN Purple Areas are the 3940 expansion areas for an additional 20ktpa plant Payo 2 South 3935 PC-1 Existing Route 16 Chico V 3930 PC-2 3925 3920 LIME-1 LIME-1 3915 K1-1 K1-2 Chico Evaporation Ponds Option 2 3910 3905 K3-1 K2-1 K2-2 K3-2 Li-1 Li-2 2500m 20ktpa LCE Processing Plant Layout with purple areas designated for second 20ktpa production line EL LITHIUM ENERGY LTD Evaporation Pond Layout for total 40,000tpa LCE production ASX:LEL 14