Investor Presentaiton
2
Six 100% Owned Gold Projects, Covering 1,914 Km²
Wadi Dubur (175 km²) – Granted Feb 2022
-
-
Four drill targets defined with channel sample results of:
Shekou Shear: 6.80 g/t Au over 18 m
Shekou Valley: 3.7 g/t Au over 10 m and 0.5 g/t over 33 m
Shark Fin Shear: 0.98 g/t Au over 79 m (inc. 1.99g/t over 33 m)
404 Shear: 0.78 g/t Au over 23 m (ending in grade > 0.5 g/t Au)
Wadi Jundi (696 km²) – Granted Feb 2022
Two discoveries with drill targets being defined:
-
Grey Granite: 3km intrusion with >5 km discontinuous hard rock
workings, rock chip result include: 58.3 g/t, 20.5 g/t, 18.8g/t Au
Manih VMS: Gossan (up to 4.32 g/t Au), iron-clay zones, silicified
andesite and exhalatives, discontinuously over ~2.4 km strike
Wadi Dubur
Wadi Jundi
Gabal Al Shaluhl
Gabal Om Ourada (349 km²) - Granted Feb 2022
Gabal Om Ourada
Prospecting stage, rock chip results including: 6.78 g/t, 6.77 g/t etc.
Gabal Al Shaluhl (346 km²) - Granted Feb 2022
Prospecting stage, rock chip resultsl: 14.75 g/t, 9.18 g/t etc.
AKH GOLD | Corporate Presentation
Bir Esl
AkhGold
Prospecting
Target
definition
Drill Targets
Scout
Drilling
Gabal El Mayyet
1
6View entire presentation