Investor Presentaiton slide image

Investor Presentaiton

2 Six 100% Owned Gold Projects, Covering 1,914 Km² Wadi Dubur (175 km²) – Granted Feb 2022 - - Four drill targets defined with channel sample results of: Shekou Shear: 6.80 g/t Au over 18 m Shekou Valley: 3.7 g/t Au over 10 m and 0.5 g/t over 33 m Shark Fin Shear: 0.98 g/t Au over 79 m (inc. 1.99g/t over 33 m) 404 Shear: 0.78 g/t Au over 23 m (ending in grade > 0.5 g/t Au) Wadi Jundi (696 km²) – Granted Feb 2022 Two discoveries with drill targets being defined: - Grey Granite: 3km intrusion with >5 km discontinuous hard rock workings, rock chip result include: 58.3 g/t, 20.5 g/t, 18.8g/t Au Manih VMS: Gossan (up to 4.32 g/t Au), iron-clay zones, silicified andesite and exhalatives, discontinuously over ~2.4 km strike Wadi Dubur Wadi Jundi Gabal Al Shaluhl Gabal Om Ourada (349 km²) - Granted Feb 2022 Gabal Om Ourada Prospecting stage, rock chip results including: 6.78 g/t, 6.77 g/t etc. Gabal Al Shaluhl (346 km²) - Granted Feb 2022 Prospecting stage, rock chip resultsl: 14.75 g/t, 9.18 g/t etc. AKH GOLD | Corporate Presentation Bir Esl AkhGold Prospecting Target definition Drill Targets Scout Drilling Gabal El Mayyet 1 6
View entire presentation