Investor Presentaiton
Mogollon Project Drilling
Hole ID
Length
Ag
Au
AgEq
(m)
(g/t)
(g/t)
(g/t)
Viewed Area
MOG23-16
MOG22-05
31.0
129
3.88
448
incl.
1.8
220
19.80
1,891
433
23.2m
Incl
2,686
1.1m
incl.
0.5
638
66.80
6,286
incl.
2.0
431
9.32
1,185
MOG23-18
MG-55
MOG23-19
GC-48
MSC-54
MOG23-14
MOGOLLON
PROPERTY
MOG22-10
1.7
73
1.37
183
MOG22-05
and
0.8
102
1.93
256
MOG23-16
and
1.2
182
3.00
420
448
Incl
and
16.6
207
3.00
445
31m
1,891
1.8m
MGR-12
MGR-14
MOG22-13
MGR-38
MGR-40
incl.
9.9
306
4.26
640
MGR-15
incl.
2.0
1002
12.90
2,004
MOG22-12
MOG23-16
0.7
92
2.44
292
and
1.0
57
1.08
144
and
0.8
21
1.00
104
250
15.6m
Incl
579
2.4m
and
23.2
134
3.66
433
MGR-08
MGR-13
incl.
1.1
484
26.30
2,686
MOG22-10
MOG23-15
MOG22-12
and
1.4
88
1.27
197
MOG22-12
15.6
60
2.29
250
incl.
2.4
115
5.56
579
445
16.6m
Incl
640
9.9m
MGR-35
MGR-10
and
1.2
28
1.32
138
1 km
and
2.5
37
1.78
185
and
10.3
59
2.12
234
incl.
4.2
98
4.13
442
*AgEq is calculated using US$20/oz Ag, US$1,800/oz Au, with metallurgical recoveries of Ag - 90% and Au - 95%. AgEq
= (Ag grade x Ag recovery)+((Au grade x Au recovery) x (Au price / Ag price))
True thicknesses are estimated to be 70-80% of drilled intercept length
Summa Silver Corp. | TSXV:SSVR | OTCQX:SSVRF | Frankfurt: 48X
Page 8View entire presentation