Investor Presentaiton slide image

Investor Presentaiton

Mogollon Project Drilling Hole ID Length Ag Au AgEq (m) (g/t) (g/t) (g/t) Viewed Area MOG23-16 MOG22-05 31.0 129 3.88 448 incl. 1.8 220 19.80 1,891 433 23.2m Incl 2,686 1.1m incl. 0.5 638 66.80 6,286 incl. 2.0 431 9.32 1,185 MOG23-18 MG-55 MOG23-19 GC-48 MSC-54 MOG23-14 MOGOLLON PROPERTY MOG22-10 1.7 73 1.37 183 MOG22-05 and 0.8 102 1.93 256 MOG23-16 and 1.2 182 3.00 420 448 Incl and 16.6 207 3.00 445 31m 1,891 1.8m MGR-12 MGR-14 MOG22-13 MGR-38 MGR-40 incl. 9.9 306 4.26 640 MGR-15 incl. 2.0 1002 12.90 2,004 MOG22-12 MOG23-16 0.7 92 2.44 292 and 1.0 57 1.08 144 and 0.8 21 1.00 104 250 15.6m Incl 579 2.4m and 23.2 134 3.66 433 MGR-08 MGR-13 incl. 1.1 484 26.30 2,686 MOG22-10 MOG23-15 MOG22-12 and 1.4 88 1.27 197 MOG22-12 15.6 60 2.29 250 incl. 2.4 115 5.56 579 445 16.6m Incl 640 9.9m MGR-35 MGR-10 and 1.2 28 1.32 138 1 km and 2.5 37 1.78 185 and 10.3 59 2.12 234 incl. 4.2 98 4.13 442 *AgEq is calculated using US$20/oz Ag, US$1,800/oz Au, with metallurgical recoveries of Ag - 90% and Au - 95%. AgEq = (Ag grade x Ag recovery)+((Au grade x Au recovery) x (Au price / Ag price)) True thicknesses are estimated to be 70-80% of drilled intercept length Summa Silver Corp. | TSXV:SSVR | OTCQX:SSVRF | Frankfurt: 48X Page 8
View entire presentation