Investor Presentaiton slide image

Investor Presentaiton

Phasing Out Coal Scenario 120 100 80 Skenario Zero Carbon 2060 (%) 1 7 9 8 29 45 50 53 8 60 40 。。 20 68 62 59 24 11 0 2020 2045 2050 PLTU 2025 2030 2040 PLTGU Nuklir ■ PLTA PLTP EBT Lain PLTS + PLTB Skenario Zero Carbon 2060 (TWh) 1800 1600 1400 1200 1000 800 600 400 200 0 2020 2025 2030 PLTU PLTGU Nuklir ■ PLTA 2040 2045 2050 2060 2060 PLTP EBT Lain PLTS + PLTB In 2060 All Power Plants in Indonesia are Using Clean Energy 1. The market size utility in 2060 is 1,800 TWh, currently electricity production is 300 TWh plus the launch of 120 TWh from the 35 GW program, so there is room for 1,380 TWh for additional New Renewable Energy (NRE) generating capacity. 2. From 2020 onwards, the portion of PLTU capacity will be reduced (in the graph, it can be seen from the decreasing black color). 3. Efforts to retire fossil power plants will start in 2030 and significantly decrease in number by 2040, following the completion of the power plant contract. 4. Nuclear plants will enter in 2040 to maintain system reliability as nuclear technology becomes more secure. 5. Phase out all coal-fired power plants in 2056, because they have been replaced by NRE. 6. Meanwhile, the development of NRE power plants will experience a massive increase starting in 2028 due to the advancement of battery technology which is getting cheaper. Then it will increase exponentially starting in 2040. And by 2045, the portion of NRE will already dominate the total power plant. The next decade, all power plants in Indonesia came from NRE. Source: PT PLN 134
View entire presentation