Investor Presentaiton
Project materially de-risked,
DFS substantially completed
Elementos has confirmed all the key data for the
project, with engineering of key elements
markedly matured, significantly de-risking the
project's development and underwriting the
confidence of the upcoming Oropesa Definitive
Feasibility Study.
ELEMENTOS
01 Mineral Resource defined - 95% Measure & Indicated categories
02 XRT Ore sorting proven – avg. 20% grade upgrade, 24% waste rejection
03 Metallurgical upgrades confirmed – Both pilot scale & variability
04 Geotechnical parameters known - Supports open cut mining
05 Groundwater studies complete - Dewatering and water sourcing achieved
06 Open pit mine designs and scheduling completed – Efficiency ensured
07 Project layouts - Efficient layouts established, minimizing disturbance
08 Tailings Dam Design – Simple design using pre-stripped waste rock
09 Waste Dumps - Simple geometry and limited potential for AMD
10 Concentrate Specifications – 62-64%Sn confirmed with limited penalties