En+ Group Investment Presentation
.
Lake Baikal
•
Ent
GROUP
En+ Group owns and manages operations at the HPP cascade ¹ located on Angara, the only river that flows out of Lake Baikal
Lake Baikal is a rift lake in the south of Eastern Siberia
Declared a UNESCO World Heritage Site in 1996, Baikal is the largest and deepest
freshwater lake in the world
En+ Group is committed to harnessing the renewable power of the Angara River in a
sustainable and responsible manner
1 cm of Baikal running through the HPP turbines produces
over 0.2 TWh of green energy
HPPS on the Angara
IRKUTSK HPP
662.4 MW
3.8 TWh²
BRATSK HPP
4,500 MW
21.2 TWh²
UST-ILIMSK HPP
3,840 MW
20.0 TWh²
BOGUCHANY HPP
2,997 MW
17.6 TWh³
Angara River
Lake Baikal
•
All operations meet or exceed regulatory requirements
1,642 m
1,500 km
Environmental & Social initiatives
Monitoring with the Severtsov Institute of Ecology and Evolution of the Russian Academy of Sciences (RAS):
The water quality and microplastic content in Baikal
The condition of Baikal seal population
Adjustment of the HPP's operating schedules to Baikal's natural water level fluctuations with Water Problems
Institute of RAS
Lake Baikal provides ca. 60% of the water resources used by the
abovementioned hydropower plants to generate energy
Boguchansk HPP1
Ust-Ilimsk HPP
•
Research on GHG emissions/absorption from reservoirs
Environmental & Social assessment of the Baikal Natural Territory in dialogue with governmental bodies,
NGOs and scientific institutes
Nature Matters - comprehensive community environmental programme. It includes:
Traditional volunteering eco-campaign "Project 360" to clean up the banks
✓Environmental Project Grant Contest to invest in local community environmental projects
Partnership with local NGO to support responsible eco-tourism in the region, creating safe tourist trails
and reducing the impact of human activity on the fragile Baikal ecosystem
Development of the international center of water resources at the industrial site of the former Baikal pulp and
paper plant in cooperation with VEB.RF and the Government of the Irkutsk region
Yenisey river
Krasnoyarsk HPP
Bratsk HPP
(1)
BEMO-A 50%/50% JV of UC RUSAL and
RusHydro, comprising Boguchany aluminium
smelter and Boguchany HPP. Boguchany HPP is
operated by RusHydro.
Irkutsk HPP
Angara river
Lake Baikal
(2) Long-term average annual power generation
volumes.
(3) Long-term average annual power generation
volumes; source: www.boges.ru.
36View entire presentation