Corentyne Acreage and Activity Overview
GCIE Near Term - Phase 1 & 2 Objective
2023
cgx①
energy inc
Build and operate initial phase of the Berbice Deep Water Port to service the
highly active offshore oil and gas exploration industry and agricultural sector in the
Guyana-Suriname Area
•
•
•
•
•
•
•
.
45x30 meter wharf platform and 49x12 meter approach trestle from shoreline into the Berbice River
Capable of accommodating 1 Supply Vessel or Cargo Vessel
World-class compact yard, covered warehousing, and tubular storage on site
Construction of access road and bridges and utility services
Full range of services: water, bulk dry and liquid mud supply, cement, electricity, fuel, container
mobilization of agriculture products
Full range of security services and secure bonded area for controlled customs accountability
(fenced and protected)
Dredging of an access channel to 7m at low tide and basin alongside wharf to 8.5m at low tide, complete
shoreline protection
Full-service wharf support for offshore drilling
Administrative offices and customs administration offices
Workshop and covered warehouse
Fire protection system
Completely contained waste management
Facility targeted to be operational 2023
Full indemnification insurance will be procured to protect environment, existing infrastructure, public and
client property
www.cgxenergy.com
22
22View entire presentation