Grasberg Project and Financial Update slide image

Grasberg Project and Financial Update

Grasberg - World Class Block Cave Design FREEPORT FOREMOST IN COPPER Substantial Infrastructure in Place to Support Large-Scale Production Grasberg Block Cave DMLZ Plan View 100 meters. Future PB Future PB PB2S Current Cave Future PB PB3 PB2N + PBIN PB1C Ramp-up Schedule (000's t/d of Ore) N->>>> Plan View 100 meters 126 130 129 N 101 PB1S 71 PB Production Block PB1S 2 Gave Fronts 5 Production Blocks Currently Active 31 9 2019 2020 2021e 2022e 2023e 2024e 2025e ■ Continuation of Ore Mined in Open Pit (300 meters below) ■874 mm t @ 1.08% Copper & 0.73 g/t Gold YE 2020 Reserves: 17 bn lbs Copper; 13 mm ozs Gold By 2023: 335,000 Sq Meter Footprint (over 80 acres) ■Life of Mine: 725,000 Sq Meter Footprint (180 acres) Fully Autonomous Underground Rail System Annual Production @ Avg. Reserve Grade (1) 950 mm lbs Copper & 700,000 ozs Gold (1) Access to higher ore grades expected in early years of production. e = estimate. See Cautionary Statement. Future PB Future PB Ramp-up Schedule (000's t/d of Ore) 57 69 72 78 78 PB1N Current Cave PB2N 2 Gave Fronts PB Production Block 3 Production Blocks, 2 Currently Active 29 10 2019 2020 2021e 2022e 2023e 2024 2025e ■ Located Below DOZ Underground Block Cave Mine 1,500 meters below surface 439 mm t @ 0.89% Copper & 0.72 g/t Gold ■YE 2020 Reserves: 7 bn lbs Copper; 8 mm ozs Gold By 2022: 200,000 Sq Meter Footprint (~ 50 acres) ■Life of Mine: 450,000 Sq Meter Footprint (110 acres) ■ Annual Production @ Avg. Reserve Grade (1) 500 mm lbs Copper & 540,000 ozs Gold 32 2
View entire presentation