Investor Presentaiton slide image

Investor Presentaiton

2023 Magino Reserve Expansion Program Began in Q3 • Resource body remains open at depth, along strike to the east towards Alamos' Island Gold Mine, and west along strike • Target 0.5 1.0 Moz added to reserves . Conversion of resources to reserves could support an increase to process capacity from 10,000 tpd (current plan) to a range of 15,000 tpd 20,000 tpd E Current Resource Cone Max Depth 550m Current Reserve Pit Max Depth 350m • Potentially increases production to over 200,000 oz/year • Fully permitted to process up to 35,000 tpd and TMF to 135Mt W Measured Indicated Inferred Not Drilled Looking South Convert open pit resources to reserves within the pit cone Update block model and perform an engineering analysis to determine optimal processing rates Test targets at depth Mineral Resources (1) Increased to 5.4 Moz Au Based on Exploration Drilling Below the Reserve Pit ARGONAUT GOLD 1. Mineral Resources are inclusive of Mineral Reserves TSX: AR | 8
View entire presentation