2019 Interim Results Credit Presentation slide image

2019 Interim Results Credit Presentation

MREL¹ Loss absorption amount Recapitalisation + amount 26.39% MREL Target 1.5% O-SII² 2.5% CCB2 2.25% P2R2 8% Own Funds Pillar 1 Requirement 2019 Interim Results Credit Presentation Market Confidence Charge 1.5% O-SII² -1.25% 2.75% 2.5% CCB2 -0.86%3 2.25% P2R2 8% Own Funds Pillar 1 Requirement 9.39% 14.25% The Group has been advised of the decision by the SRB and the Bank of England of its binding MREL requirement to be met by 1 January 2021 This has been set at a level of 12.86% of total liabilities and own funds as at December 2016 (equivalent to 26.39% of risk weighted assets) Current MREL target calibration excludes UK & ROI CCyBs. CCyBs expected to be included in future target calibrations • Modest issuance of c.€1-2bn p.a. expected to meet this requirement Minimum Requirement for Own Funds and Eligible Liabilities as at 30 June 2019 2 Other Systemically Important Institution (O-SII), Capital Conservation Buffer (CCB) and Pillar 2 Requirement (P2R) 3 Bank Specific Adjustment of 0.86% Bank of Ireland 29 29
View entire presentation